Laserfiche WebLink
Ordinance No. 2220 <br /> Page 11 of 26 <br /> These requirements shall be printed on the construction plans to the satisfaction of the <br /> Director of Community Development. <br /> 33. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle <br /> are not allowed on the construction site except when needed as sleeping quarters for a <br /> security guard subject to receipt of a temporary conditional use permit (per PMC <br /> 18.116.010.E). <br /> 34. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the <br /> project site for daily administration/coordination purposes during the construction period. <br /> 35. CONSTRUCTION AND PARKING MANAGEMENT PLAN: In accordance with the Traffic <br /> Control Plan, the applicant shall prepare a construction and parking management plan to <br /> address impacts and parking demands during the construction phase of the project. The <br /> construction and parking management plan shall be subject to review and approval by the <br /> City Traffic Engineer and Director of Community Development prior to issuance of a <br /> demolition permit, or the first building permit, whichever comes first. Separate construction <br /> and parking management plans may be required for each phase of the project, depending <br /> on timing of construction in each phase. The following items shall be incorporated into the <br /> construction and parking management plan(s): <br /> a. Show truck route for construction and delivery trucks that does not include <br /> neighborhood residential streets, unless approved by the City Traffic Engineer; <br /> b. Show construction vehicles and equipment parking area, materials storage, <br /> temporary fencing, construction trailer location, and construction <br /> contractors/workers parking area. <br /> c. Sidewalk closure or narrowing is not allowed during on-site construction <br /> activities without prior approval by the City. <br /> 36. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the <br /> project site and as far as possible from existing residences and shall be emptied to prevent <br /> odor. <br /> 37. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off-hauled <br /> from the site and disposed of in a lawful manner. No temporary stockpiling of dirt on this <br /> site shall occur without specific review and approval by the Director of Community <br /> Development. If stockpiling is allowed, said stockpiles must be covered if rain is forecast. <br /> 38. NOTICE OF CONSTRUCTION: Prior to construction of any project phase, the applicant <br /> shall notify neighbors within 300-feet of the project site of the construction schedule in <br /> writing. Such notice shall include contact names and numbers for property owner, agent <br /> or contractor. If access to any bus stops operated by Livermore Amador Valley Transit <br /> Authority is obstructed, then advance notice shall be sent to the Authority so drivers and <br /> passengers can be alerted. <br /> 39. DISTURBANCE COORDINATOR: The applicant shall designate a "disturbance <br /> coordinator" who shall be responsible for responding to any complaints regarding <br /> construction noise, dust, construction parking, etc. The coordinator (who may be an <br /> employee of the general contractor) shall determine the cause of the complaint and shall <br /> require the implementation of reasonable measures warranted to correct the problem. A <br /> telephone number of the disturbance coordinator shall be posted on the construction site <br />