My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
090721
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 9:31:21 AM
Creation date
9/1/2021 9:27:28 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/7/2021
DESTRUCT DATE
15Y
NOTES
11300 DUBLIN CANYON ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No.2220 <br /> Page 18 of 26 <br /> of the map. If the applicant withdraws their application in writing prior to recordation of the <br /> map, unspent Acting City Surveyor's fees will be refunded to the applicant. If the Acting <br /> City Surveyor's estimate is insufficient to cover their services, the applicant shall pay the <br /> difference between the initial estimate and the actual cost prior to submittal of the map for <br /> the Director of Engineering/City Engineer's signature. (Address this condition prior to City <br /> approval of the parcel map.) <br /> 79. IMPROVEMENT PLAN AND MAP REVIEW FEES: The applicant shall pay all applicable <br /> plan check review fees to the Engineering Department with the first submittal of the <br /> improvement plans, grading plans, and parcel map. (Address this condition prior to Grading <br /> and/or Building Permit issuance.) <br /> 80. SUBDIVISION FEES—PARCEL MAPS: The applicant shall pay all subdivision fees to the <br /> Engineering Department prior to Director of Engineering/City Engineer approval of the <br /> parcel map at the rate in effect at the time of the approval for the total number of buildable <br /> lots on the map. (Address this condition prior to City approval of the parcel map.) <br /> 81. IMPROVEMENT SECURITY—PARCEL MAPS: The applicant shall submit a performance <br /> bond and labor and material bond, or other improvement security acceptable to the <br /> Director of Engineering/City Engineer, for all private and public subdivision improvements <br /> necessary to serve the subdivision to the Engineering Department prior to Director of <br /> Engineering/City Engineer approval of the parcel map. Both bonds shall be in an amount <br /> equal to 100 percent of the cost estimate as approved by the Director of Engineering/City <br /> Engineer. The improvement security may be waived if the necessary improvements have <br /> been constructed to the satisfaction of the Director of Engineering/City Engineer prior to <br /> City Engineer approval of the parcel map. (Address this condition prior to City approval of <br /> the parcel map.) <br /> 82. WARRANTY BOND: The applicant shall submit a one-year warranty bond in an amount <br /> of 10 percent of the full value of all public subdivision improvements necessary to serve <br /> the subdivision to the Engineering Department prior to City Council acceptance of the <br /> public subdivision improvements. (Address this condition prior to City approval of the <br /> parcel map.) <br /> 83. EROSION CONTROL AND HAZARD MITIGATION BOND: The applicant shall submit a <br /> refundable cash deposit to the Engineering Department for erosion control and hazard <br /> mitigation in an amount determined by the Director of Engineering/City Engineer prior to <br /> issuance of a encroachment, grading or subdivision permit, whichever occurs first. The <br /> City will retain the cash deposit until all work is substantially complete, all areas are <br /> stabilized, and all hazards are mitigated to the satisfaction of the Director of <br /> Engineering/City Engineer. (Address this condition prior to Grading and/or Building Permit <br /> issuance.) <br /> 84. STORMWATER TREATMENT MEASURES INSPECTION AND MAINTENANCE <br /> AGREEMENT: The applicant shall enter into a "Stormwater Treatment Measures <br /> Inspection and Maintenance Agreement" for annual maintenance and reporting of the <br /> stormwater treatment system as depicted on the improvement plans City-approved by the <br /> Director of Engineering/City Engineer. The agreement shall be filed for record at the <br /> Alameda County Clerk-Recorder's Office at a time determined by the Director of <br /> Engineering/City Engineer. (Address this condition prior to Occupancy Permit issuance.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.