Laserfiche WebLink
Ordinance No.2220 <br /> Page 9 of 26 <br /> type and location of all exterior light fixtures shall be reviewed and approved by the <br /> Director of Community Development prior to building permit issuance. <br /> 22. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey <br /> and a site development plan in accordance with the provisions of Chapter 18.68 of the <br /> PMC. These plans shall be approved by the Chief Building Official prior to building permit <br /> issuance for buildings or site improvements in each phase. The site development plan <br /> shall include all required information to design and construct site, grading, paving, <br /> drainage, and utilities. <br /> 23. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation <br /> certification prepared by a California licensed land surveyor or registered civil engineer to <br /> the Chief Building Official and Director of Community Development certifying the pad <br /> elevations and building locations (setbacks) are conforming to the approved plans, prior <br /> to receiving a foundation inspection for structures in each phase. <br /> 24. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height <br /> certification prepared by a California licensed land surveyor or civil engineer to the Director <br /> of Community Development before the first framing or structural inspection by the Building <br /> and Safety Division, for structures in each phase. The height of the structures shall be <br /> surveyed and verified as being in conformance to the approved building heights as shown <br /> on Exhibit B or as otherwise conditioned. <br /> 25. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br /> occupancy of any building. <br /> 26. TRANSFORMERS: New electrical transformers shall beplaced underground, or <br /> g <br /> aboveground and screened from view to the satisfaction of the Director of Community <br /> Development. Details of the new electrical transformers, and any screening architecturally <br /> compatible with the building, shall be included in the building permit submittal and shall be <br /> subject to the review and approval of the Director of Engineering/City Engineer and <br /> Director of Community Development prior to building permit issuance. <br /> 27. MECHANICAL EQUIPMENT— SCREENING: The applicant shall effectively screen from <br /> view all ducts, meters, air conditioning equipment, and any other mechanical equipment, <br /> whether on the structure, on theround or on the roof, with materials architecturally <br /> gto ally <br /> compatible with the building. Screening details shall be shown on the plans submitted for <br /> building permit, the.adequacy of which shall be determined by the Director of Community <br /> Development. All required screening shall be installed prior to final occupancy. <br /> 28. TRASH ENCLOSURE: All trash,, refuse, and recycling shall be contained completely <br /> within enclosures constructed with roofs. Containers shall be stored within the enclosures <br /> at all times except when being unloaded. The enclosures shall be sized to accommodate <br /> trash, recycling, and green waste containers in compliance with the Alameda County <br /> Mandatory Recycling Ordinance. The materials and colors of any new enclosures shall <br /> match or be compatible with the primary building on site and the gates shall be metal or <br /> solid wood unless otherwise approved by the Director of Community Development. <br /> Elevation drawings and plan details, including color and material of the enclosures noted, <br /> shall be included in the building permit submittal and shall be subject to the review and <br /> approval of the Director of Community Developmentprior to building permit issuance. <br />