My WebLink
|
Help
|
About
|
Sign Out
PC-2018-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2018
>
PC-2018-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 2:07:00 PM
Creation date
7/27/2021 2:06:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/26/2018
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2018-16
NOTES
P18-0217, P18-0218, CUP & Design Review for Sonshine Preschool (Rondash), 1225 Hopyard Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
64. RETAINING WALLS: All retaining walls along the street shall be located behind the <br /> public service easement (PSE), unless otherwise approved by the Director of <br /> Engineering/City Engineer. All retaining walls with a minimum height of 4 feet, <br /> measured from the bottom of the footing to the finished grade at the top of the wall, and <br /> all retaining walls with a surcharge shall be designed by a California licensed civil or <br /> structural engineer <br /> 65. EROSION CONTROL MEASURES FOR COMMERCIAL DEVELOPMENTS: The <br /> applicant shall submit an erosion control plan designed by a certified Qualified SWPPP <br /> (Stormwater Pollution Prevention Plan) Practitioner (QSP) for all projects disturbing <br /> 1 acre or more or by a California licensed civil engineer or California licensed landscape <br /> architect for all projects disturbing less than 1 acre of land, subject to the review and <br /> approval of the Chief Building and Safety Official. All cut and fill slopes shall be <br /> hydromulched/hydroseeded and stabilized immediately after the completion of grading <br /> work and in no case later than October 1 , unless otherwise approved by the Chief <br /> Building and Safety Official. No grading shall occur between October 1 and April 30 <br /> unless erosion control measures are in place, subject to the review and approval of the <br /> Chief Building and Safety Official. Such measures shall be maintained until the <br /> permanent landscaping is completed to the satisfaction of the Chief Building and Safety <br /> Official and the Notice of Termination for the coverage under the Construction General <br /> Permit, if applicable, is approved by the State Water Resources Board. <br /> Construction <br /> 66. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall <br /> obtain an encroachment and haul route permit from the Engineering Department prior to <br /> performing work in the public right of way and/or within public easements. The <br /> applicant's contractor shall submit a completed and signed encroachment permit <br /> application accompanied with six copies of City-approved improvement plans, proof of <br /> insurance with endorsement adding the City as an additional insured, a copy of a valid <br /> City of Pleasanton business license, applicable fees, and other requirements <br /> determined by the Director of Engineering/City Engineer. (Project Specific Condition) <br /> 67. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant <br /> shall repair damage to existing public and private improvements on and near the project <br /> site and along the haul route at their full expense caused by construction activities as <br /> determined by and to the satisfaction of the Director of Engineering/City Engineer and <br /> prior to the to the building permit being finalized. (Project Specific Condition) <br /> 68. RECONSTRUCT DEFICIENT SIDEWALK: Remove and reconstruct uplifted <br /> (approximately 8' x 4') sidewalk near the driveway on the Golden Road frontage and <br /> grind any uplifted sidewalk along the frontage as determined by and to the satisfaction <br /> of the Director of Engineering/City Engineer and prior to the building permit being <br /> finalized. (Project Specific Condition) <br /> P18-0217 and P18-0218 Planning Commission <br /> Page 12 of 14 <br />17 and P18-0218 Planning Commission <br /> Page 10 of 14 <br />-125, 2350 Santa Rita Road Planning Commission <br /> Page 17 of 21 <br />25, 2350 Santa Rita Road Planning Commission <br /> Page 15 of 21 <br />g Commission <br /> Page 3 of 21 <br />