Laserfiche WebLink
or Federal Holidays or Sundays. The Director of Community Development may allow <br /> earlier "start times" or later "stop times" for specific construction activities, e.g., concrete <br /> pouring. All construction equipment shall meet Department of Motor Vehicles (DMV) <br /> noise standards and shall be equipped with muffling devices. Prior to construction, the <br /> hours of construction shall be posted on site. <br /> 11. CULTURAL RESOURCES: If any prehistoric or historic artifacts, or other indication of <br /> cultural resources are found once the project construction is underway, all work shall <br /> stop within 20-meters (66 feet) of the find. A qualified archaeologist shall be consulted <br /> for an immediate evaluation of the find prior to resuming groundbreaking construction <br /> activities within 20-meters of the find. If the find is determined to be an important <br /> archaeological resource, the resource shall be either avoided, if feasible, or recovered <br /> consistent with the requirements of the State California Environmental Quality Act <br /> (CEQA) Guidelines. In the event of discovery or recognition of any human remains in <br /> any on-site location, there shall be no further excavation or disturbance of the site or <br /> any nearby area reasonably suspected to overlie adjacent remains until the County <br /> coroner has determined, in accordance with any law concerning investigation of the <br /> circumstances, the manner and cause of death and has made recommendations <br /> concerning treatment and dispositions of the human remains to the person responsible <br /> for the excavation, or to their authorized representative. A similar note shall appear on <br /> the building permit and/or improvement plans. <br /> Fees <br /> 12. FEES: The applicant shall pay any and all fees to which the property may be subject, <br /> prior to issuance of grading and/or building permits, or prior to recordation of the final <br /> map, whichever is applicable. The type and amount of the fees shall be those in effect <br /> at the time the permit is issued. <br />unit on the <br /> north side of the residence. (Project Specific Condition) <br /> 7. PAINTING: Prior to issuance of a building permit, the applicant shall submit revised <br /> plans for Planning Division review and approval indicating the exterior staircase will <br /> be painted to match the color of the residence. (Project Specific Condition) <br /> 8. BUILDING MATERIALS AND COLORS: The building materials and colors in the <br /> Approved Plans shall be stated on the building permit plans. <br /> Construction Practices and Noticing <br /> 9. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br /> final inspection by the Building and Safety Division. (Project Specific Condition) <br /> 10. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br /> material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br /> 8 a.m. to 5 p.m., Monday through Saturday. No construction shall be allowed on State <br />ed on all exterior doors. The <br /> exterior doors of the establishment shall remain closed when not being used for <br /> ingress/egress purposes. (project specific condition) <br />ing "happy hour" or other reduced-price alcohol promotions) for the review and <br />anta Rita Road Planning Commission <br /> Page 20 of 21 <br /> area shall drain into the trash <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 17 of 21 <br />25, 2350 Santa Rita Road Planning Commission <br /> Page 15 of 21 <br />g Commission <br /> Page 3 of 21 <br />