My WebLink
|
Help
|
About
|
Sign Out
PC-2018-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2018
>
PC-2018-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 1:33:54 PM
Creation date
7/27/2021 1:33:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/25/2018
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2018-08
NOTES
PUD-125, PUD for Carpenter's Training Trust Fund (CTC), 2350 Santa Rita Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of the City Engineer. The applicant's engineer shall submit a final subdrain location map <br /> to the City Engineer prior to acceptance of the public improvements. It shall be the <br /> responsibility of the owner to relocate a subdrain if a subdrain is encountered during the <br /> excavation of any subsurface structure. <br /> 71. A detailed grading and drainage plan prepared by a licensed Civil Engineer including all <br /> supporting information and design criteria (including but not limited to any peer review <br /> comments), storm drain treatment calculations, hydromodification worksheets, etc., <br /> shall be submitted as part of the improvement plans. <br /> 72. The minimum grade for the gutter flowline shall be set at one percent where practical, <br /> but not less than 0.75% unless otherwise approved by the City Engineer. <br /> Building and Safety Division <br /> 73. At the time of building permit plan submittal, the project developer shall submit a final <br /> grading and drainage plan prepared by a licensed civil engineer depicting all final <br /> grades and on-site drainage control measures to prevent stormwater runoff onto <br /> adjoining properties. <br /> 74. Prior to issuance of building or demolition permits, the applicant shall submit a waste <br /> management plan to the Building and Safety Division. The plan shall include the <br /> estimated composition and quantities of waste to be generated and indicate how the <br /> project developer intends to recycle at least 75 percent of the total job site construction <br /> and demolition waste measured by weight or volume. Proof of compliance shall be <br /> provided to the Chief Building Official prior to the issuance of a final building permit. <br /> During demolition and construction, the project developer shall mark all trash disposal <br /> bins "trash materials only" and all recycling bins "recycling materials only." The project <br /> developer shall contact Pleasanton Garbage Service for the disposal of all waste from <br /> the site. <br /> 75. The applicant and/or developer shall submit a pad elevation certification prepared by a <br /> licensed land surveyor or registered civil engineer to the Chief Building Official and <br /> Director of Community Development certifying that the pad elevation(s) and building <br /> location (setbacks) are pursuant to the approved plans, prior to receiving a foundation <br /> inspection for the structure. <br /> 76. The current State of California's Green Building Standards Code, "CAL Green," shall <br /> apply, as applicable. <br /> Livermore-Pleasanton Fire Department (LPFD) <br /> 77. The project developer shall keep the site free of fire hazards from the start of lumber <br /> construction until the final inspection. <br /> 78. Prior to any construction framing, the project developer shall provide adequate fire <br /> protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major fire. <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 12 of 21 <br />ve subdrains installed unless <br /> otherwise approved by the City Engineer and the developer's soils engineer. All <br /> subdrains shall have cleanouts installed at the beginning of the pipe. The end of the <br /> pipe shall terminate in a storm drain or other storm drain outfall, subject to the approval <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 11 of 21 <br />by the top-edge of the equipment <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 3 of 21 <br />