Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> VI. LIVERMORE PLEASANTON FIRE DEPARTMENT Eff.01.01.2020 <br /> 24 Vehicle Access Gate, not part of a building $217.00 <br /> 25 Refrigerant System, each $618.00 <br /> 26 High-Piled storage of combustibles: <br /> a Class I-IV 2,500 sq ft- 12,000 sq.ft. $400.00 <br /> b Class I-IV 12,001 sq ft-500,000 sq ft $664.00 <br /> c High Hazard $927.00 <br /> 27 Smoke Control System $1,488.00 <br /> 28 SPAs, CUP, PUD $366.00 <br /> 29 Each site inspection,after twice failed same inspection $526.00 <br /> 30 Underground Storage Tank(UST) Installation: <br /> a Up to 2 tanks $2,403.00 <br /> b Each additional tank $229.00 <br /> D. Miscellaneous Fees <br /> 1 Candles and Open Flame in Assembly,per event $183.00 <br /> 2 Carnivals and Fairs, per event $343.00 <br /> 3 Exhibits and Trade Shows, per event $538.00 <br /> 4 Pyrotechnical Special Effects show, per show $1,385.00 <br /> 5 Temporary Membrane Structures, per event $217.00 <br /> 6 Seasonal Lots(Xmas, Pumpkin, etc.), each lot $217.00 <br /> 7 Open Burning,each application $149.00 <br /> 8 Alternate Means or Method Application, each $183.00 <br /> 9 Hydrant Flow Test,per area tested $355.00 <br /> 10 Incident Reports, each $6.00 <br /> 11 Licensed Care Facilities-Fire Clearance(other than Single-Family Home $378.00 <br /> Residential Care),each <br /> 12 Dump Houses, each $1,236.00 <br /> 13 Excessive False Alarms, each occurance $446.00 <br /> 14 Outside Plan Checker, per hour $143.00 <br /> 15 UST-Removal up to 2 tanks,per hour $170.00 <br /> 16 UST- Removal 3 or more, per hour $217.00 <br /> 17 UST-Tank top,monitoring system etc.,per hour $170.00 <br /> 18 Other Plan Checks and Inspections(Emergency repair/modification to fire $170.00 <br /> protection systems), per hour <br /> 19 Off hours inspections(3 hour minimum charge),per request $170.00 <br /> 20 Asbestos abatement, per hour $170.00 <br /> 21 Compressed Gas System High Hazard,per hour $170.00 <br /> 22 Compressed Gas System High Hazard-additional for projects with more than one $170.00 <br /> system, per hour <br /> 23 High-Rise(charge on hourly),per hour $170.00 <br /> 24 Fire Alarm Monitoring Equipment change/replacement, per hour $170.00 <br /> 25 Fire code assessment/approval change of occupancy/use/equipment/access,per $212.00 <br /> application <br /> 26 Service Required in Excess of Standard (due to size, occupancy uses or other than $170.00 <br /> local regulations), per hour <br /> 27 Fire Monitoring System Only(Water flow,associated equipment,Central Station), $400.00 <br /> per system <br /> VI. Fire 5 of 5 <br />