My WebLink
|
Help
|
About
|
Sign Out
ORD 2218
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:55 PM
Creation date
7/23/2021 10:07:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
7/20/2021
DESTRUCT DATE
PERMANENT
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> VI. LIVERMORE PLEASANTON FIRE DEPARTMENT Eff.01.01.2020 <br /> 28 a Liq Petroleum Gas: <226 gal $125.00 <br /> b Liq Petroleum Gas: 226-500 gal $149.00 <br /> c Liq Petroleum Gas: 501-2k gal $182.00 <br /> d Liq Petroleum Gas:2k-4k gal $251.00 <br /> e Liq Petroleum Gas:4-6k gal $309.00 <br /> f Liq Petroleum Gas:6+k gal $377.00 <br /> 29 Liq/Gas Vehicles in Assembly $217.00 <br /> 30 Lumber Yard or Woodworking Plant $709.00 <br /> 31 Magnesium $342.00 <br /> 32 Mall,covered $1,613.00 <br /> 33 Motor Vehicle Fuel Disp Station-no bulk $205.00 <br /> 34 Ovens, Industrial $91.00 <br /> 35 a POA:A-2 $34.00 <br /> b POA:A-1 $57.00 <br /> c POA:A-3 $68.00 <br /> d POA:A-4 $91.00 <br /> e POA:A-5 $125.00 <br /> 36 Pyrotech Spd Effects Material $663.00 <br /> 37 Refrigeration Equipment $171.00 <br /> 38 Repair Garages $389.00 <br /> 39 Rooftop Heliport $125.00 <br /> 40 Spraying or Dipping $91.00 <br /> 41 Tires-Rebuilding Plant $114.00 <br /> 42 Tire-Storage of Scrap $114.00 <br /> 43 a UST- 1 tanks $606.00 <br /> b UST-2 tanks $904.00 <br /> c UST-3 tanks $1,498.00 <br /> d UST-4 tanks $1,808.00 <br /> e UST-5 tanks $2,105.00 <br /> f UST-6 tanks $2,402.00 <br /> 44 Waste Handling $149.00 <br /> 45 Wood Products $125.00 <br /> C. Plan Review and Inspection Fees <br /> 1 Fire Sprinkler System Fees-New Construction: <br /> a up to 20 Appliances $790.00 <br /> b 21 - 100 Appliances $996.00 <br /> c 101 -200 Appliances $1,270.00 <br /> d 201 -350 Appliances $1,407.00 <br /> e 351 -1,000 Appliances, Base Fee $2,117.00 <br /> for each additional 25 Appliances above 351 $114.00 <br /> f 1,000+Appliances, Base Fee $2,941.00 <br /> for each additional 100 Appliances above 1000 $355.00 <br /> 2 Fire Sprinkler System Fees-Alteration,TI: <br /> a up to 4 Appliances $503.00 <br /> b 5-20 Appliances $549.00 <br /> c 21 - 100 Appliances $847.00 <br /> d 101 -200 Appliances $1,030.00 <br /> VI. Fire 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.