Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> III.ENGINEERING DIVISION <br /> Professional Consultant Expense Consultant cost <br /> +25% <br /> Subdivision Grading & up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Plan Section E <br /> Check each additional 1,000 cubic yard after 100,000 $8.00 <br /> D. Construction Services Inspection <br /> (due 15 days prior to City Council approval of a final map or City Engineer approval of the plans, whichever occurs first) <br /> Subdivision Grading & Up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Section E <br /> Inspection each additional 1,000 cubic yards over 100,000 $12.00 <br /> Construction Inspection <br /> City-inspected improvements: Base Fee Plus <br /> Valuation under$5,000 $137 8.5%of valuation <br /> Valuation$5,000-$20,000 $425 3.26%of valuation >$5,000 <br /> Valuation over$20,000 $1,077 4.72%of valuation >$20,000 <br /> Specialized Inspections Consultant cost <br /> +25% <br /> Overtime Inspection <br /> (2 hour minimum charge) Cost+Overhead <br /> E. Assessment Districts <br /> City Engineering Department Administration <br /> (during formation, design, and construction) Cost+Overhead <br /> Inspection See Construction <br /> (Minimum charge is 4%of costs to construct public improvements) Inspec. Fee Table <br /> Segregation Administration <br /> Fee per district $590.00 <br /> 1/13/2021 III. Engineering: 2 of 2 <br />