Laserfiche WebLink
Water Connection Fees <br /> See the Pleasanton Municipal Code Chapter 14.08, Water, and Zone 7 for more information. <br /> http://gcode.us/codes/pleasanton/ http://www.zone7water.com/. Connection fees for new or upgraded <br /> water services are based on the size of the water meter(s) and the connection rate in effect at the time of <br /> payment, not application date. The project designer determines the size and number of meters needed for <br /> the project. The Building and Safety Division collects water connection fees only for one- and two-family <br /> residential domestic water meters. The Engineering Division collects water connection fees for all other <br /> occupancies and projects. (eff. 1/01/2021) <br /> Recycled Water Potable Water <br /> Meter Meter Gallons Meter Connection Fee** Connection Fees* <br /> Size Type per Min Fee City Only City and Zone 7 <br /> 5/8'x 3/4, Displacement 10 $420 $17,044 $30,640 <br /> 3/4' Displacement 15 $470 $25,566 $45,960 <br /> 1" Displacement 25 $570 $40,427 $76,600 <br /> 1"Combo*** Displacement 25 $570 N/A $32,440*** <br /> 1-1/2" Displacement 50 $730 $80,854 $153,200 <br /> utner water meter <br /> sizes &types **** **** **** $1,704.40 per GPM $3,640 per GPM <br /> Note: Water Connection charges are based on the flow rate of each water meter, without any reduction. <br /> No water connection fee is collected for separate private fire service connections. <br /> * Fees collected for both Zone 7 and City of Pleasanton. <br /> **Check with the Engineering Department for areas where Recycled Water(Non-Potable) Service is available. <br /> ***One-&two-family homes with fire sprinkler systems on a combined 1"water meter pay the 1"City <br /> connection fee, but only the 5/8"Zone 7 water connection fee. (Zone 7 Ord. FC 0-91-68) <br /> ****Connection fee, meter type and availability of all water meters must be verified prior to payment. <br /> Impervious Surface Drainage Fee <br /> (3'd party fee collected for the Alameda County Flood Control& Water Conservation District, Zone 7) <br /> $1.00 per sq ft of impervious surface (effective 01/01/11) <br /> Zone 7 Drainage District fees are collected for all newly constructed impervious area and are based on the <br /> total square footage increase of all impervious surfaces on the lot or site. Surface Drainage Fees are only <br /> payable at time of permit issuance and are based upon the rate in effect at the time of payment, not <br /> application date. Impervious is defined by the Zone 7 Drainage District as any area occupied by buildings or <br /> structures, driveways, streets, sidewalks, parking, storage or any other area where surfacing is required, and <br /> any other surface including, but not limited to, asphalt, concrete, compacted gravel, or other nor-porous or <br /> semi-porous substance or substances which will cause, assist, or in any way contribute to the runoff in any <br /> appreciable amount or quantity of water or any associated liquid elements. See http://www.zone7water.com/ <br /> for more information. <br /> School Impact Fees <br /> California state law requires School Impact fees must be paid before building permits may be issued for <br /> new construction and additions exceeding 500 square feet. The School Impact Fee is paid by the <br /> applicant directly to the Pleasanton Unified School District(PUSD)for all new construction and additions <br /> exceeding 499 square feet in area. Prior to issuance of the building permit, the developer or applicant will <br /> need to schedule an appointment with their Business Services Department at(925)426-4312. You will <br /> need to submit the completed PUSD Acknowledgement/Certification form to the Building Division in order <br /> to issue the Building Permit. The Pleasanton Unified School District website is <br /> https://www.pleasantonusd.net. <br /> Page 5 of 6 <br />