Laserfiche WebLink
Ordinance No. 2217 <br /> Page 11 <br /> exterior materials. Prior to building permit final, all of the green building measures <br /> indicated on the approved checklist shall be inspected and approved by either the City of <br /> Pleasanton, a third party rater, or the applicant shall provide written verification by the <br /> project engineer, architect, landscape architect, or designer. (Project Specific <br /> Condition) <br /> Construction Practices and Noticing <br /> 25. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br /> material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br /> 8 a.m. to 5 p.m., Monday through Saturday. No construction shall be allowed on State or <br /> Federal Holidays or Sundays. The Director of Community Development may allow <br /> earlier"start times" or later "stop times" for specific construction activities, e.g., concrete <br /> pouring. All construction equipment shall meet Department of Motor Vehicles (DMV) <br /> noise standards and shall be equipped with muffling devices. Prior to construction, the <br /> hours of construction shall be posted on site. <br /> 26. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar <br /> vehicle are not allowed on the construction site except when needed as sleeping <br /> quarters for a security guard subject to receipt of a temporary conditional use permit (per <br /> PMC 18.116.010.E). <br /> 27. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the <br /> project site for daily administration/coordination purposes during the construction period. <br /> 28. CONSTRUCTION AND PARKING MANAGEMENT PLAN: In accordance with the Traffic <br /> Control Plan, the applicant shall prepare a construction and parking management plan to <br /> address impacts and parking demands during the construction phase of the project. The <br /> construction and parking management plan shall be subject to review and approval by <br /> the City Traffic Engineer and Director of Community Development prior to issuance of a <br /> demolition permit, or the first building permit, whichever comes first. Separate <br /> construction and parking management plans may be required for each phase of the <br /> project, depending on timing of construction in each phase. The following items shall be <br /> incorporated into the construction and parking management plan(s): <br /> a. Show truck route for construction and delivery trucks that does not include <br /> neighborhood residential streets, unless approved by the City Traffic <br /> Engineer; <br /> b. Show construction vehicles and equipment parking area, materials storage, <br /> temporary fencing, construction trailer location, and construction <br /> contractors/workers parking area. <br /> c. Sidewalk closure or narrowing is not allowed during on-site construction <br /> activities without prior approval by the City. <br /> 29. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the <br /> project site and as far as possible from existing residences and shall be emptied to <br /> prevent odor. <br /> 30. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off- <br /> hauled from the site and disposed of in a lawful manner. No temporary stockpiling of dirt <br /> on this site shall occur without specific review and approval by the Director of <br />