My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
072021
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2021 11:42:41 AM
Creation date
7/15/2021 11:36:17 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/20/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No.2217 <br />Page 19 <br />72 TRASH ENCLOSURES: Trash areas including containers for trash, recycling, and <br />organic waste/composting shall be enclosed and roofed per the city's trash enclosure <br />design guidelines available on the City's website and as required by the NPDES Permit <br />No. CAS612008 and amendments, issued by the San Francisco Bay RegionalWater <br />Quality Control Board. The trash enclosure shall be constructed to prevent stormwater <br />run-on and runoff and to contain litter and trash, so that it is not dispersed by the wind or <br />runoff during waste removal. The area enclosed shall drain to the sanitary sewer system <br />and an area drain shall be installed in the enclosure area, providing a structural control <br />such as an oil/water separator or sand filter. No other area shall drain into the trash <br />enclosure. A sign shall be posted prohibiting the dumping of hazardous materials into <br />the sanitary sewer. <br />73 FULL TRASH CAPTURE DEVICES: The applicant shall install trash capture devices at <br />each upstream connection point to the public storm drain system subject to the review <br />and approval of the Director of Engineering/City Engineer. Stormwater treatment <br />controls, proposed in compliance with Provision C.3 of NPDES Permit No. CAS612008, <br />shall also prevent the discharge of trash to the downstream municipal separate storm <br />sewer systems and receiving waters. Discharge points from these treatment control <br />facilities, including overflows, shall be appropriately screened (5 mm mesh screen) or <br />othenrvise configured to meet the full trash capture screening specification for storm <br />flows up to the full trash capture 1-year, 1-hour storm hydraulic specification, in <br />compliance with the NPDES Permit No. CAS612008. The applicant shall submit a <br />Stormwater Management Plan as part of the improvement plans prepared by a <br />California licensed civil engineer, which include but is not limited to the type, location, <br />and sizing calculations of the treatment controls that will be installed. Full trash capture <br />devices shall be a part of the "Stormwater Treatment Measures and Maintenance <br />Agreement." <br />74 CONSTRUCTION COMPLETION: Prior to occupancy of Phase I and all subsequent <br />phases of the project, the applicant shall provide the following documents to the City <br />lnspector: <br />a. A letter prepared and signed by the applicant's engineer of record certifying <br />the project permanent stormwater treatment measures and Hydromodification <br />Management (HM) measures, if applicable, have been installed in <br />accordance with the City approved improvement plans. Photographs shall be <br />taken of all the stormwater treatment measures and HM measures, if <br />applicable, and identified by matching the identification number stated in the <br />city accepted improvement plans.b. Signed and completed construction Project Completion lnspection Checklistc. Bio retention soil certification form completed and certified by the applicant's <br />soil supplier. <br />FIRE DEPARTMENT - 925.454-2361 <br />The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and <br />fire hydrant locations only. Plan check comments and approval DO NOT include: 1.) lnstallation <br />of the on-site fire mains and fire hydrants. Specific installation drawings submitted by the <br />licensed underground fire protection contractor shall be submitted to the Fire Prevention Bureau <br />for approval; and 2.) Backflow prevention or connections to the public water mains.
The URL can be used to link to this page
Your browser does not support the video tag.