project, depending on timing of construction in each phase. The following items shall be
<br /> incorporated into the construction and parking management plan(s):
<br /> a. Show truck route for construction and delivery trucks that does not include
<br /> neighborhood residential streets, unless approved by the City Traffic Engineer;
<br /> b. Show construction vehicles and equipment parking area, materials storage,
<br /> temporary fencing, construction trailer location, and construction
<br /> contractors/workers parking area.
<br /> c. Sidewalk closure or narrowing is not allowed during on-site construction
<br /> activities without prior approval by the City.
<br /> 36. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the
<br /> project site and as far as possible from existing residences and shall be emptied to
<br /> prevent odor.
<br /> 37. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off-
<br /> hauled from the site and disposed of in a lawful manner. No temporary stockpiling of dirt
<br /> on this site shall occur without specific review and approval by the Director of Community
<br /> Development. If stockpiling is allowed, said stockpiles must be covered if rain is forecast.
<br /> 38. NOTICE OF CONSTRUCTION: Prior to construction of any project phase, the applicant
<br /> shall notify neighbors within 300-feet of the project site of the construction schedule in
<br /> writing. Such notice shall include contact names and numbers for property owner, agent
<br /> or contractor. If access to any bus stops operated by Livermore Amador Valley Transit
<br /> Authority is obstructed, then advance notice shall be sent to the Authority so drivers and
<br /> passengers can be alerted.
<br /> 39. DISTURBANCE COORDINATOR: The applicant shall designate a "disturbance
<br /> coordinator" who shall be responsible for responding to any complaints regarding
<br /> construction noise, dust, construction parking, etc. The coordinator (who may be an
<br /> employee of the general contractor) shall determine the cause of the complaint and shall
<br /> require the implementation of reasonable measures warranted to correct the problem. A
<br /> telephone number of the disturbance coordinator shall be posted on the construction site
<br /> fence and on the notification sent to neighbors adjacent to the site. The sign shall also list
<br /> an emergency after-hours contact number for the disturbance coordinator, or designee.
<br /> 40. CULTURAL RESOURCES: If any prehistoric or historic artifacts, or other indication of
<br /> cultural resources are found once the project construction is underway, all work shall stop
<br /> within 20-meters (66 feet) of the find. A qualified archaeologist shall be consulted for an
<br /> immediate evaluation of the find prior to resuming groundbreaking construction activities
<br /> within 20-meters of the find. If the find is determined to be an important archaeological
<br /> resource, the resource shall be either avoided, if feasible, or recovered consistent with
<br /> the requirements of the State California Environmental Quality Act (CEQA) Guidelines. In
<br /> the event of discovery or recognition of any human remains in any on-site location, there
<br /> shall be no further excavation or disturbance of the site or any nearby area reasonably
<br /> suspected to overlie adjacent remains until the County coroner has determined, in
<br /> accordance with any law concerning investigation of the circumstances, the manner and
<br /> PUD-114-01M& P20-0995 Planning Commission
<br /> Page 8 of 25
<br /> April 15,
<br /> and from August 15 through October 30, in order to avoid take of non-volant
<br /> (non—flying or inactive, either young, or seasonally torpid) individuals.
<br /> PUD-114-01M& P20-0995 Planning Commission
<br /> Page 3 of 25
<br />YCROSSCRISFIELD .*- 4-; -,47÷-'' 1.1--1 ''.-. HAM
<br /> ;-----fk;s7,4G
<br /> il
<br /> 3`
<br /> • kst • .7
<br /> I DIJNIYA1:1%, ..4.. ,i4is' '1 , „J 10 ,,,...
<br /> ‘1 'kTIAV - 1) \ ‘ ' ?) $.Y \t, ,2:2/
<br /> \ ‘ 111-,-,: .
<br /> ,..... i ..., i
<br /> 1:11,343
<br /> o 0.125 0.25 mi PUD-140, Townsend, Lot Line, 2207 Martin Ave Planning Division =-- -.• .-.... , 1:16
<br /> I i II May 10,2021 FLEA:.,ANTON.
<br /> 0 650 1,300 Feet
<br /> |