Laserfiche WebLink
HACIENDA DRDET. 39 (145FT)DET. 40 WHITE(130FT)DET. 9 (770FT)DET. 9 (770FT)DET. 9 (795FT)DET. 9 (795FT)CONFORMCONFORM <br />CALTRANS R/WCALTRANS R/WCALTRANS R/WCALTRANS R/WCALTRANS R/WCALTRANS R/WCALTRANS R/WCALTRANS R/WCALTRANS R/WCALTRANS R/WCALTRANS R/WGREEN BIKE LANEPAVEMENT MARKING (225SF)GREEN BIKE LANEPAVEMENT MARKING(405SF)12-INCH WHITE(40FT)DET. 39 (145FT)CONFORM45FT15FTTRANSITION W/CDHH12FT11FTDET. 9 (90FT)DET. 9 (90FT)DET. 9 (90FT)DET. 9 (90FT)12FT11FT12FT6FTDET. 39 (385FT)12-INCH WHITE(32FT)DHH4-INCH WHITE (23FT)DET. 39 (45FT)GREEN BIKE LANEPAVEMENT MARKING(315SF)CMSPAINT MEDIAN NOSE YELLOW(42FT)PAINT MEDIANNOSE YELLOW(6FT)H0+00H1+00H2+00DIDIDIDIDHHDHHDHHDHH5.5FTDET. 38 (90FT)6-INCHWHITE(70FT)12-INCH WHITEX-WALK (90FT)DET. 37 (90FT)R/R CAR POOLLANE LEGENDAND ARROWYIELDLINE(12FT)HACIENDA DRDET. 25 (780FT)DET. 25 (795FT)DET. 39A (88FT)DET. 39A (120FT)DET. 39A (120FT)DET. 39 (395FT)DET. 39 (395FT)DET. 39 (815FT)DET. 39 (815FT)5FTDET. 39A (88FT)DET. 39A (88FT)DET. 39A(120FT)4-INCH WHITE(100FT)GREEN BIKE LANEPAVEMENT MARKING (190SF)CONFORMCONFORMCONFORMCONFORMCONFORMCONFORMGREEN BIKE LANEPAVEMENT MARKING(200SF)DHH4-INCH WHITE(90FT)BRIDGE DECKSTRIPING REPLACEMENT WITHPAINT ONLY ON BRIGE DECK12FT11FT5FT12FT11FT12FT2FT2FT12FT12FT5FT2FT11FT12FTH3+00H4+00H5+00H6+00H7+00H8+00H9+00DHH5FT S/W4FT MEDIAN1FT5FT S/WH-123AS SHOWNHACIENDA DRIVE STA H0+00 TO STA H09+05GRAPHIC SCALE(IN FEET)40200\\pleasdata\pw\Engineering\Streets\Annual Resurfacing - CIP 21053\Design\Drawings\CAD\CIP-21053_HaciendaDrive.dwg\4-23-21 11:52am snguyen <br />DWG NO.SCALE:PROJECT NO.:DATE:STEPHEN M. KIRKPATRICKCITY ENGINEERNO. 53367EXP. 6/30/21DESIGN:DRAWN:CHECKED:TRAFFIC ENGINEER:CITY OF PLEASANTONDepartment of EngineeringREV.DATEDESCRIPTIONANNUAL STREETS RESURFACING AND PREVENTATIVE MAINTENANCE PROJECTOFAPRIL 22, 2021CIP-21503HHANMT26SNNOTE:1.THIS DISPLAY WINDOW ENTIRELY IN CALTRANS' R/W.R/W LINE NOT SHOWN (BEYOND DISPLAY WINDOW).2.LIMIT OF WORK: STA H0+00 TO STA H11+85