My WebLink
|
Help
|
About
|
Sign Out
21
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
061521
>
21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:59:37 PM
Creation date
6/9/2021 3:58:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIS OF DESIGN REPORT EXECUTIVE SUMMARY I PFAS TREATMENT AND WELL REHABILITATION PROJECT I CITY OF PLEASANTON <br /> TOTAL <br /> DESCRIPTION <br /> (Direct+Indirect) <br /> 01 PFAS Media Pre-Purchase $1,770,000 <br /> 02 PFAS Vessels Pre-Purchase $6,290,000 <br /> 03 Well 9 Drilling&Casing Installation $1,120,000 <br /> 04 Well 10 Drilling&Casing Installation $1,320,000 <br /> 05 CTF and Well 8 Rehabilitation $12,690,000 <br /> 06 CTF Pipeline $3,170,000 <br /> 07 Well 9 Equipping&Site Development $3,380,000 <br /> 08 Well 10 Equipping&Site Development $2,740,000 <br /> 09 Well Abandonment $290,000 <br /> 10 Santa Rita Pipeline Replacement $900,000 <br /> 11 Well 9&10 Portable Generators $930,000 <br /> TOTAL ESTIMATED CONSTRUCTION COST I $34,600,000 <br /> The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional <br /> opinion of accurate costs at this time and is subject to change as the project design matures. Cerollo Engineers have no control over <br /> variances in the cost of labor materials,equipment:nor services provided by others.contractor's means and methods of executing the <br /> wok or of determining prices,competitive bidding or market conditions,practices or bidding strategies. Carrillo Engineers cannot and <br /> does not warrant or guarantee that proposals,bids or actual construction costs will not vary from the costs presented as shown. <br /> Figure 7 Project Cost Estimate <br /> DRAFT MAY 2021 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.