My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1 EXHIBIT A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
060121
>
14 ATTACHMENT 1 EXHIBIT A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 1:11:04 PM
Creation date
5/20/2021 4:52:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/1/2021
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT B
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT C
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT D
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 6 <br />Water Supply Characterization <br />6.2.6 Desalinated Water <br />THE CITY OF <br />PL£ASANTON <br />Due to infeasibility, the City does not independently consider the development of a desalinated water <br />system as a source of water within the planning horizon. This includes ocean water, brackish water, and <br />groundwater desalination (though Zone 7 desalinates a portion of its groundwater). However, <br />desalination has been identified as a potentially viable water source for several Bay Area water suppliers, <br />including Zone 7. The Bay Area Regional Desalination Project (BARDP) is detailed in Section 6.2.8.1. <br />6.2.7 Water Exchanges and Transfers <br />The City currently does not have any potable water transfer agreements, nor does the City anticipate <br />participating directly in any such transfer opportunities in the future. <br />Zone 7 periodically supplements existing supplies with short-term transfers when needed and intends to <br />more regularly acquire water transfers over the coming decade until major supply reliability project(s) <br />come online starting around 2030. A transfer agreement with another SWP contractor using the SWP <br />system—which Zone 7 is already invested in—is likely the most expedient and cost-effective transfer <br />option. Transfer water would be conveyed to Zone 7 through the Delta and the SBA; the transfer amount <br />could vary from year-to-year depending on hydrology but could average between 5,000 to 10,000 AFY. <br />For the 2020 UWMP, Zone 7 is assuming 5,000 AFY in water transfers through 2030. <br />Zone 7 will continue to pursue and evaluate transfer opportunities in the Bay Area and statewide. Through <br />the Bay Area Regional Reliability Partnership, Zone 7 is participating in a reclamation grant -funded project <br />to develop a "Regional Water Market Program," which will identify transfer types and opportunities and <br />develop a road map to facilitate transfers and exchanges in the Bay Area. Zone 7's existing water transfer <br />supply sources and non -local storage options are detailed in Chapter 6 of Zone 7's 2020 UWMP. <br />6.2.8 Future Water Projects <br />The City obtains its potable water supply from Zone 7 and supports its efforts to pursue opportunities of <br />future water supply projects. The City itself does not have any plans for new water supply projects, as <br />shown in Table 6-8. <br />Table 6-8. Expected Future Water Supply Projects or Programs (DWR Table 6-7 Retail) <br />NOTES: The City does not plan to pursue opportunities for development of future water supply projects; rather, it supports Zone Ts <br />efforts. <br />WEST YOST <br />6-24 <br />City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.