Laserfiche WebLink
Resolution No. PC-2021-07 <br /> Page Nineteen <br /> Stormwater and Provision C.3 of the National Pollutant Discharge Elimination System Permit <br /> 66. STORMWATER TREATMENT: The project creates and/or replaces 10,000 square feet <br /> or more of impervious surface (collectively over the entire project site) and shall comply <br /> with Section "C.3.b Regulated Projects" of the NPDES Permit No. CAS612008, and <br /> amendments, issued by the San Francisco Bay Regional Water Quality Control Board. <br /> The improvements plans shall include the Stormwater Management Plan prepared by a <br /> California licensed civil engineer, indicating the type and locations of stormwater <br /> treatment measures to be installed (numbered sequentially for identification purposes), <br /> and sizing calculations. The Stormwater Management Plan shall be subject to review and <br /> acceptance by the Director of Engineering/City Engineer, prior to the issuance of an <br /> engineering or building permit, whichever occurs first. <br /> 67. STORMWATER TREATMENT MEASURES INSPECTION AND MAINTENANCE <br /> AGREEMENT: The applicant shall enter into a "Stormwater Treatment Measures <br /> Inspection and Maintenance Agreement" for annual maintenance and reporting of the <br /> stormwater treatment system as depicted on the improvement plans City-approved by the <br /> Director of Engineering/City Engineer. The agreement shall be filed for record at the <br /> Alameda County Clerk-Recorder's Office at a time determined by the Director of <br /> Engineering/City Engineer. <br /> 68. HYDROMODIFICATION MANAGEMENT: The project will create and/or replace 1 acre or <br /> more of impervious surface and increase the total impervious surface area over the pre- <br /> project surface area and shall comply with Section "C.3.g Hydromodification <br /> Management" of NPDES Permit No. CAS612008 and amendments, issued by the San <br /> Francisco Bay Regional Water Quality Control Board, except where on the three <br /> provisions stated in the permit applies. Post construction stormwater runoff shall drain to <br /> approved permanent Hydromodification Management (HM) controls to mitigate increases <br /> in peak runoff flow and increased runoff volume created by the project. The improvement <br /> plans shall include the Stormwater Management Plan, prepared by a California licensed <br /> civil engineer, indicating the type and locations of HM controls to be installed, sizing <br /> calculations using Bay Area Hydrology Model (BAHM). The Stormwater Management <br /> Plan shall be subject to review and acceptance by the Director of Engineering/City <br /> Engineer, prior to issuance of an engineering or building permit, whichever occurs first. <br /> Stormwater HM controls required under this condition shall be provided for in the <br /> Stormwater Treatment Measures Inspection and Maintenance Agreement. <br /> 69. STATE OF CALIFORNIA CONSTRUCTION GENERAL PERMIT: A "Notice of Intent" <br /> (NOI) and "Stormwater Pollution Prevention Plan" (SWPPP) shall be prepared for <br /> construction projects disturbing 1 acre or more of land (including smaller sites that are <br /> part of a larger common plan of development). The applicant shall include the Waste <br /> Discharger Identification Number (WDID) on the title sheet of the improvement plans and <br /> provide proof of coverage under the State of California Construction General Permit to <br /> the Engineering Department prior to the approval of the improvement plans by the <br /> Director of Engineering/City Engineer. <br />pril 30 <br /> unless erosion control measures are in place, subject to the review and approval of the <br /> Chief Building and Safety Official. Such measures shall be maintained until the <br />ould prevent or <br /> 4412928_2 -10- <br /> the Project, which list shall include the following items: <br /> 4412928_2 -8- <br />