My WebLink
|
Help
|
About
|
Sign Out
3_Exhibits E-G
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2021
>
05-26
>
3_Exhibits E-G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 6:01:33 PM
Creation date
5/19/2021 6:01:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/26/2021
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
sewer capacity shall be charged at the rates in place as of the date of issuance of the building <br /> permits. <br /> Section 3.05 Water Meter Fee. The Property is currently served by the potable water meters as <br /> set forth in Exhibit D. The Developer is entitled to use any or all of these meters to service Phase <br /> 1 development as well as subsequent phases provided the utility billing for each account remains <br /> non-delinquent. Unused water meters shall be permanently decommissioned by removal of the <br /> meter by City staff,removal of the service lateral to the main by the Developer in accordance with <br /> City Standard Specification 14-03I "Abandonment of Water Facilities", and termination of utility <br /> billing by the Developer. If any existing water meter will be changed to a different size to <br /> accommodate Phase 1 development or subsequent phases, the Developer will be entitled to a fee <br /> credit for both the City Connection Fee and the Zone 7 Connection Fee in effect at the time of <br /> payment,not application date, for the replaced meter. The Developer shall then be required to pay <br /> the current Meter Fee,the City Connection Fee, and the Zone 7 Connection Fee for the new meter <br /> according to the Fee Schedule in effect at that time. Any service lateral upgrades will be the <br /> obligation of the Developer including all Encroachment Permit Fees and backflow prevention <br /> device testing and certification <br /> Section 3.06 School Fees. Developer shall pay school fees in accordance with a written <br /> agreement entered into, or to be entered into, between Developer and the Pleasanton Unified <br /> School District("PUSD"), and Developer shall provide to City, prior to building permit issuance, <br /> PUSD's written confirmation of such agreement. <br /> Section 3.07 Tri-Valley Transportation Council Fee. The Developer shall pay the Tri-Valley <br /> Transportation Council fee prior to building permit issuance. <br /> Section 3.08 Traffic Mitigation Measures. <br /> PHASE 1 TRAFFIC IMPACT ANALYSIS("TIA")MITIGATION MEASURES: The Developer <br /> shall comply with the mitigation measures identified in the Project TIA,prepared by Fehr& Peers <br /> dated March 2021,to the reasonable satisfaction of the City's Traffic Engineer. These mitigation <br /> measures are the following provisions: <br /> a. Construct a westbound buffered bike lane on Stoneridge Drive or alternate facility if <br /> approved by the City's Traffic Engineer along the Property frontage(Mitigation 1 in TIA). <br /> b. Construct "cycle track" facility along the northern Property frontage that is adjacent to <br /> Stoneridge Mall Road or alternate facility if approved by the City's Traffic Engineer <br /> (Mitigation 2 in TIA) <br /> a. The cycle track will include modifications at both adjacent intersections to allow <br /> for safe access and egress. <br /> c. Construct a mixed-use path along the east side of the Property (Mitigation 2 in TIA.) <br /> Construct improvements at Stoneridge Mall Road and Genomics Place. Improvements include <br /> the conversion of the westbound through lane to a second westbound left turn lane and <br /> conversion of the westbound right turn lane into a through plus right lane(Condition of Approval <br /> 2 in TIA.) <br /> 4412928_2 -6- <br />s set forth in Exhibit C. The cost for any additional needed <br /> 4412928_2 -5- <br />