My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
051821
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 10:04:53 AM
Creation date
5/12/2021 10:04:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/18/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inventory of housing sites (including input from HCD) within 8-10 months of project <br /> initiation, that will be the basis of the required CEQA review beginning in late 2021. <br /> Following completion of the sites analysis, the public review draft of the housing element <br /> will be created, and taken through a review process that incorporates a required review <br /> by HCD, as well as input from City Commissions and the City Council. <br /> Table 2: Pro'ect Schedule <br /> Task Month <br /> Introductory Kick-Off Meetings April — May 2021 <br /> Housing Needs Assessment; Policies and May - September 2021 <br /> Programs Review <br /> Initial Sites Inventory, Methodology and July - September 2021 <br /> Criteria <br /> Preparation of Comprehensive CEQA November 2021 <br /> Project Description, based on initial sites <br /> inventory <br /> Environmental Review Scoping and NOP December 2021 <br /> CEQA Sites Inventory Selection Meetings December 2021 — January 2022 <br /> Prepare Technical Studies; Draft Housing December 2021 — May 2022 <br /> Element and EIR <br /> HCD 60-Day Review Period June - July 2022 <br /> Meetings to Review PRD Housing June - July 2022 <br /> Element <br /> Public Draft Program EIR (45-Day July-August 2022 <br /> Review Period) <br /> Final Sites Inventory and Final Housing August— October 2022 <br /> Element <br /> Public Hearings to adopt Housing November 2022 — January 2023 <br /> Element and Final EIR <br /> Housing Element Public Participation Plan <br /> City staff and LWC have prepared a draft Public Participation Plan (PPP) outlining key <br /> opportunities for public participation (see Attachment 2.) The draft PPP was presented to <br /> the Housing and Planning Commissions on May 12th and May 13th respectively. Due to <br /> the timing of these meetings relative to publication of the City Council agenda report, a <br /> summary of public and Commissioner comments and/or concerns will be provided to the <br /> City Council under separate cover. The draft PPP is now being presented to the City <br /> Council as the final opportunity to provide input on and refine the proposed plan. <br /> Role of the Planning Commission, Housing Commission and City Council <br /> As part of the Housing Element update process, the City Council considered the overall <br /> scope of work for the Housing Element and directed that the Planning Commission would <br /> act as the lead advisory board to guide the detailed development of the Housing Element <br /> (versus a separately appointed task force), with input from the Housing Commission, and <br /> frequent consultation with the City Council. The Planning Commission will tackle the full <br /> Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.