Laserfiche WebLink
Ken Mercer Playground Renovation <br /> ROSS RECREATION I PROPOSAL R.SS <br /> Playground Renovation Unit Price <br /> Temporary Fencing, Portable Toilets&Handwashing Stations $4,452.53 <br /> Removal and haul away of existing play equipment. $9,334.00 <br /> Landscape Structures Design#1149426-01-04 including Hedra, Hedra Scout and Swings for <br /> Eastern Play Area&Baseball Themed PlayBooster, Clubhouse and Swings in Central Area. $189,430.00 <br /> Installation of Landscape Structures design#1149426-01-04 by a manufacturer certified <br /> installer with standard manufacturer footing details. *Installation price quoted for favorable <br /> working conditions. If rock, poor soil conditions, a high water table and/or other unforeseen $56,829.00 <br /> site conditions exist requiring additional materials and labor, additional charges may apply. <br /> Fibar engineered wood fiber safety surfacing materials(top off) $8,170.67 <br /> Blow In Installation of Wood Fiber(top off) $9,802.67 <br /> One Time Discount on Labor:one time new product introduction discount that is eligible only $5,026.10 <br /> on order that includes the Hedra&Hedra Scout. <br /> One Time New Product Discount: eligible only with Hedra&Hedra Scout -$15,154.40 <br /> Sales Tax(9.25%) $16,876.28 <br /> Freight $20,041.56 <br /> Total $294,756.21 <br /> Bid Alternate-Music Features in Central Play Area Unit Price <br /> Landscape Structures Rhapsody Warble Chimes&Tongue Drum Jr(for Central Area) $7,165.00 <br /> Installation of Rhapsody Chimes and Drum $2,149.50 <br /> Sales Tax(9.25%) $662.76 <br /> Playground Renovation+Bid Aft Total $304,733.47 <br /> Notes to Customer <br /> Thank you for the opportunity to quote your upcoming project. PLEASE NOTE:quote does not include payment and <br /> performance bonds,engineering calculations,security,storage,permits,or inspection unless otherwise noted.Your purchase is <br /> subject to the terms and conditions of this quote,approval of this quote agrees to those terms. If ordering materials after the <br /> expiration date, please add 3-6%annually to materials for anticipated price increase. Please also note that sales tax will be <br /> based on the current rate at the time of shipping,not order date. Customer will be expected to cover these taxes. <br /> Ross Recreation will provide labor using a subcontractor for all installation and labor quoted. Neither Ross Recreation nor our <br /> subcontractors are signatory to any unions, however compliance with prevailing wage rate requirements will occur. If union <br /> enrollment is required by our subcontractor for completion of this project, Ross Recreation will require a change order to cover <br /> the costs of a per project enrollment and additional wage/benefit requirements. <br /> Ross Recreation Equipment Co., Inc • 100 Brush Creek Road#206,Santa Rosa,CA 95404•707.538.3800 1 <br /> info@rossrec.com •www.rossrec.com •Contractors License#520752 •DIR#1000003500 <br />