My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
031621
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 1:27:25 PM
Creation date
3/12/2021 1:27:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/16/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION <br /> In response to the direction provided by City Council, staff advertised a Request for <br /> Qualifications (RFQ) for the public outreach and conceptual design phase of the <br /> proposed skatepark project. The RFQ was advertised on December 9, 2020. Ten <br /> design firms submitted a Statement of Qualifications (SOQ) prior to the January 13, <br /> 2021, submittal deadline. City staff reviewed the SOQ and invited the top four firms for <br /> interviews for the second week of February. A panel with representatives from the <br /> Library and Recreation, Operations Services, and Engineering Departments conducted <br /> the interviews. The interviewed firms were: <br /> 1. RRM Design Group <br /> 2. New Line Skateparks, Inc. <br /> 3. Verde Design, Inc. <br /> 4. Grindline Skateparks, Inc. <br /> Based on the ratings of the SOQ, interviews, input from local skatepark advocates <br /> involved in the selection process, and reference checks, staff recommends awarding <br /> the contract to RRM Design Group for $115,154. <br /> Schedule <br /> The proposed schedule for this project is as follows: <br /> Award of contract March 16, 2021 <br /> Public Outreach and Conceptual Design March 2021-Dec. 2021 <br /> Final Concept Plan December 2021 <br /> Construction Documents TBD <br /> Submitted by: Fiscal Review: Approve by: <br /> t J <br /> /(11// <br /> Stephen Kirkpatrick / Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Estimated Funding and Expenditure Summary <br /> 2. Design Professional Service Agreement with RRM Design Group <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.