Laserfiche WebLink
DRAFT 2021 Recommended Positions on Bills <br /> Assembly Bill/ Summary Guiding Recommended City Position TVC League of <br /> Senate Bill Principle Position CA Cities <br /> Position <br /> SB 7 (Atkins) The California Environmental Quality Housing Support with Amendments. None Watch <br /> Environmental Act (CEQA) requires a lead agency, Although the City typically takes <br /> quality: Jobs and as defined, to prepare, or cause to the approach of preparing a <br /> Economic be prepared, and certify the Master EIR or similar program- <br /> completion of an environmental <br /> Improvement level CEQA document, with <br /> Through impact report (EIR) on a project that streamlined review for subsequent <br /> the lead agency proposes to carry <br /> Environmentalout or approve that may have a project, the State should continue <br /> Leadership Act of significant effect on the environment to allow local jurisdictions the <br /> 2021 or to adopt a negative declaration if it flexibility to determine the <br /> finds that the project will not have appropriate level of CEQA review, <br /> that effect. CEQA also requires a even for projects for which state <br /> lead agency to prepare a mitigated funding has been received. <br /> negative declaration for a project that <br /> may have a significant effect on the <br /> environment if revisions in the <br /> project would avoid or mitigate that <br /> effect and there is no substantial <br /> evidence that the project, as revised, <br /> would have a significant effect on the <br /> environment. CEQA authorizes the <br /> preparation of a master EIR and <br /> authorizes the use of the master EIR <br /> to limit the environmental review of <br /> subsequent projects that are <br /> described in the master EIR, as <br /> specified. This bill would require a <br /> lead agency to prepare a master EIR <br /> for a general plan, plan amendment, <br /> plan element, or specific plan for <br /> housing projects where the state has <br /> provided funding for the preparation I ? RAFT <br /> of the master EIR. <br /> 4 <br /> February 5,202/ <br />