Laserfiche WebLink
BID SUMMARY <br /> LS 7 and LS 8 Ventilation and Lighting Improvements,CIP 21267 <br /> Unit of <br /> Item No. Quantity Item Description Engineers Estimate Blocka Construction Inc. Saboo Inc. WestCal Design and Build,Inc. <br /> (Approximate) Measure 445 Boulder Court 415 Beatrice Court,Suite H 32108 Alyarado Blvd,#208 Union <br /> Pleasanton,CA 94566 Brentwood,CA 94513 City,CA 94587 <br /> I 1 LS Mobilization/Demobilization $21,000 $50,000 $120,000 $20,000 <br /> "Temporary ventilation and gas <br /> 2 1 LS monitoring system during $73,000 $20,000 $210,000 $50,000 <br /> construciton both Lift Stations <br /> 3 1 I S Ventilation and Electrical $503,000 $524,000 $501,000 $475,000 <br /> Improvements at Lift Station 7 <br /> 4 1 I S Ventilation and Electrical $503,000 $524,000 $705,000 $475,000 <br /> Improvements at Lill Station 8 <br /> TOTAL $1,100,000 $1,118,000 $1,536,000 $1,020,000 <br /> - - <br /> Prime <br /> Blocka Construction Inc. Saboo Inc. WestCal Design and Build,Inc. <br /> National Air Balance Co. <br /> Subcontractors Full Service Electric Wulff Electric,Inc. <br /> Inc. <br /> Terra-Con.Inc. Top Notch Mechanical California Roofing Co.Inc. <br /> OC McDonald Co.,Inc. <br /> —i <br /> 2 <br /> rn <br /> Z <br /> NJ <br />