My WebLink
|
Help
|
About
|
Sign Out
CASTLEWOOD SEWERS
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
CASTLEWOOD SEWERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2007 9:26:45 AM
Creation date
5/13/2004 9:34:33 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/25/1985
LONG TERM AGREEMENTS - NAME
CASTLEWOOD SEWERS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-05
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS, of the total 308 RDK caparity desired for the CSA, 183 are <br />currently flowing; and <br /> <br /> WHEREAS, capacity for the CSA has not been provided within existing DSRSD <br />and LAVWMA facilities, except Tot 39,000 GPD ADMM, and expansion of these facilities <br />is therefore necessary; and <br /> <br /> WHEREAS, DSRSD and LAVWMA have been studying alternatives to expansion <br /> <br />and have embarked on a program to expand the LAVWMA export facilities by approx- <br />imately 4.38 Million Gallon per Day (MGD) ADMM, with the DSRSD treatment facilities <br />being expanded proportionately to accommodate DSRSD's and the City's allocated <br />capacities within the LAWWMA expansion; and <br /> <br /> WHEREAS, County desires City to provide CSA a fixed amount of sewage <br />treatment and disposal capacity from City's entitlements in the DSRSD treatment <br />plant and LAVWMA export disposal facility in the event the LAVWMA export facility's <br />capacity is expanded by 428 MGD and the County is willing to pay its prorated <br />share of the City's cost of the 4.38 MGD LAVWMA expansion and the corresponding <br />increase in capacity of the DSRSD sewage treatment plant; and <br /> <br /> WHEREAS, City's West Pleasanton Interceptor Sewer was constructed by <br /> <br />an assessment district including the territory of the CSA and was designed to <br />accept a certain number of residential units for sewage from that territory <br />presently in the CSA; and <br /> <br /> WHEREAS, CSA has developed plans and specifications to the satisfaction <br /> <br />of City for the connection to the West Pleasanton Interceptor Sewer; and <br /> <br /> WHEREAS, upon expansion of the LAVWMA and DSRSD facilities, the City will <br />have capacity within its collection (West Pleasanton Interceptor Sewer), treatment <br />(DSRSD treatment plant), and export disposal (LAVWMA facilities) facilities to <br />serve the CSA; <br /> <br /> NOW, THEREFORE, the parties agree as follows: <br /> <br /> 1. Connection to West Pleasanton Interceptor Sewer. County will construct, <br />or have constructed, and pay all costs of constructing sewer facilities between <br />the existing Castlewood collection system and the southerly terminus of the West <br />Pleasanton Interceptor Sewer System, including all ccnnectlons to the West P!easantnn <br />Interceptor Sewer, said construction being done in conformance with City approved <br />plans and specifications. <br /> <br /> 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.