My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
121520
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2020 1:56:10 PM
Creation date
12/9/2020 12:39:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/15/2020
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fund balance, revenues, expenditures and transfers for Funds 422 and 432 for fiscal <br /> years 2015/16 through 2019/20 are detailed in Attachment 3. <br /> The following is a summary by fund of the projects that the City is committed to <br /> complete in coming years with available Water and Sewer Connection fees: <br /> Water Expansion Fund (422) <br /> • Water Tank Corrosion Repairs #18127 <br /> Description: This project provides for the recoating of the steel water tanks at Ruby <br /> Hill, Moller, and Laurel Creek that have all exhibited corrosion and warrant repair. In <br /> addition, this project will make structure repairs and upgrades as necessary, and <br /> replace the cathodic protection systems of the tanks. <br /> Approximate project completion date: 2021 <br /> Project cost: $2,420,000 <br /> % funded by development impact fees: 29% <br /> Source of funding: Water Connection Fees (29%); Water Replacement Funds (71%) <br /> • Bi-Annual Water Quality Improvement#17100 <br /> Description: The purpose of this project is to improve water quality by installing <br /> appurtenances in the City's water system network which improve circulation and <br /> reduce disinfection byproducts. <br /> Approximate project completion date: On-Going <br /> Project cost: $460,000 <br /> % funded by development impact fees: 76% <br /> Source of funding: Water Connection Fees (76%); Water Replacement Funds (24%) <br /> • Tri-Valley Potable Reuse Master Plan #18151 <br /> Description: Phase 2 of the Tri-Valley Potable Reuse fee study. Masterplan project to <br /> determine scope of potable reuse facilities. <br /> Approximate project completion date: 2021 <br /> Project cost: $300,000 <br /> % funded by development impact fees: 100% <br /> Source of funding: Water Connection Fees (100%) <br /> Sewer Expansion Fund (432) <br /> • EALS/EARS Pump Station and Pipeline Construction — project#11231 <br /> Description: Construction of the East Amador Relieve Sewer (EARS) pump station to <br /> take flow off of the East Amador Lift Station (EALS) Pump station. <br /> Approximate project completion date: 2022 <br /> Project cost: $4,800,000 <br /> % funded by development impact fees: 3.4% <br /> Source of funding: Sewer Connection Fees (3.4%); Sewer Replacement Funds <br /> (95.8%), Developer Contributions (0.8%) <br /> • Del Valle Parkway/Nevada Street Sewer Additions— project#90228 <br /> Description: Installation of a 16" sewer main line from Stanley Bvld to Bernal Avenue. <br /> Approximate project completion date: 2022 <br /> Project cost: $1,222,700 <br /> Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.