Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> D. Tri-Valley Transportation Development Fee (due at the time building permit is issued) <br /> - Fee collected for Tri-Valley Development Council to fund traffic mitigation improvements in the Tri-Valley Development Area <br /> - Subject to an annual inflation adjustment(by the TVTC)on March 1 of each year based upon the Engineering News Record <br /> Construction Cost Index for the San Francisco Bay Area <br /> Residential Single-family detached $4,901.69 <br /> (per dwelling unit) Single-family attached (Townhouse) $4,901.69 <br /> Multi-family(Apartment, Condominium) $3,376.48 <br /> Second Unit(In-law, Aupair, etc.) $0.00 <br /> Affordable Housing <br /> Non-residential Office, per square foot of gross floor area $8.34 <br /> Retail, per square foot of gross floor area $3.75 <br /> Industrial, per square foot of gross floor area $4.85 <br /> Other Uses, per average am/pm peak hour trip $5,446.41 <br /> E. Downtown Revitalization District Parking In-Lieu Fee <br /> - When development within the Downtown Revitalization District is not able to accommodate all of its required parking onsite the <br /> following fee will be collected by the City to purchase land for and to construct public parking lots. <br /> - This fee subject to annual inflation adjustment on April 1 of any year in which the fee has not been recalculated,based on the <br /> annual change in Engineering News Record Construction Cost Index. <br /> per parking space $ 21,802.68 <br /> F. Water Connection Fees - City <br /> For each single family house, or any other use that is determined by the City Engineer or the Engineer's duly <br /> appointed representative to have a water demand equivalent to that of a single-family house, for normal <br /> domestic-type water uses only, there shall be a connection fee charged for each service connection as <br /> indicated in the following table. This shall be the minimum charge for all uses. For all other uses, for each <br /> service connection, a charge shall be made as established in the following table depending on the size of the <br /> meter required for that service connection as determined by the City Engineer or his duly appointed <br /> representative. <br /> N. Pleasanton All Other <br /> Meter Size Improvement Service <br /> 5/8 inch (displacement type) $ 460.00 $ 1,200.00 <br /> 3/4 inch (displacement type) $ 690.00 $ 1,800.00 <br /> Amounts at right DO NOT include water meter 1 inch (displacement type) $ 1,150.00 $ 3,000.00 <br /> installation fees, which are revised periodically 1.5 inch (displacement type) $ 2,300.00 $ 6,000.00 <br /> based on current costs for labor& materials as 2 (displacement type) $ 3,680.00 $ 9,600.00 <br /> authorized in Section B"Water Meter& 2" Mueller MVR $ 5,290.00 $ 13,800.00 <br /> Installation Fees". 2" (OMNI C2) $ 7,360.00 $ 19,200.00 <br /> 3 inch (OMNI C2) $ 8,050.00 $ 21,000.00 <br /> 4 inch (OMNI C2) $ 23,000.00 $ 60,000.00 <br /> 6 inch (OMNI C2) $ 46,000.00 $ 120,000.00 <br /> 8 inch (OMNI C2) $ 80,500.00 $ 210,000.00 <br /> 10 inch (OMNI C2) $126,500.00 $ 330,000.00 <br /> For any service connection larger than listed above, the City Engineer or his duly appointed <br /> representative will determine the charge; or a battery of meters may be used at the City Engineer's <br /> Any change in use or addition requiring greater capacity will require the payment of additional fees at the <br /> rates established herein as a condition of continued service. <br /> 11/20/2020 XI. Development: 2 of 4 <br />