My WebLink
|
Help
|
About
|
Sign Out
RES 04016
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2004
>
RES 04016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2004 11:28:13 AM
Creation date
5/4/2004 11:26:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/30/2004
DOCUMENT NO
RES 04016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120. <br /> <br />121. <br /> <br />122. <br /> <br />123. <br /> <br />review and approval of the City Engineer/Director of Building Inspection. If no grading <br />plan is required, necessary erosion control/storm water quality measures shall be shown <br />on the site plan submitted for an on-site permit, subject to the review and approval of the <br />Director of Building Inspection. The project developer is responsible for ensuring that <br />the contractor is aware of and implements such measures. <br /> <br />All cut and fill slopes shall be revegetated and stabilized after completion of grading, but <br />in no case later than October 15. Hydroseeding shall be accomplished before September <br />15 and irrigated with a temporary irrigation system to ensure that the grasses are <br />established before October 15. No grading shall occur between October 15 and April 15 <br />unless approved erosion control/storm water quality measures are in place, subject to the <br />approval of the City Engineer/Director of Building Inspection. Such measures shall be <br />maintained until such time as permanent landscaping is place. <br /> <br />All metal roofs shall be finished with mst-inhibitive paint. <br /> <br />The project developer shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of building <br />and/or grading permits. These BMP's shall be implemented by the general contractor and <br />all subcontractors and suppliers of materials and equipment. Construction site cleanup <br />and control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br /> <br />The project developer is responsible for implementing the following measures during <br />construction of the project: <br /> <br />Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to storm <br />water runoff pollution. <br /> <br />bo <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather. Broom sweep the street pavement adjoining the <br />project site on a daily basis. Scrape caked-on mud and dirt from these areas before <br />sweeping. <br /> <br />Co <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br /> <br />PCUP-63/PDR-243 Conditions of Approval Page 23 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.