My WebLink
|
Help
|
About
|
Sign Out
ORD 2210
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:55 PM
Creation date
10/15/2020 1:20:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/15/2020
DESTRUCT DATE
PERMANENT
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40. WATER FEES AND WATER METER CONNECTION FEES: The applicant shall pay the <br /> applicable Zone 7 and City connection fees and water meter cost for any water meters <br /> and irrigation meters, if applicable, prior to building permit issuance. <br /> 41. SEWER FEES: The applicant shall pay the applicable Dublin-San Ramon Services <br /> District (DSRSD) and City sewer permit fees prior to building permit issuance. <br /> 42. SCHOOL IMPACT FEES: Applicant shall work with the Pleasanton Unified School <br /> District (PUSD) to develop a program to offset this project's long term effect on school <br /> facility needs in Pleasanton. This program shall be designed to fund school facilities <br /> necessary to offset this project's reasonably related effect on the long-term need for <br /> expanded school facilities. The method and manner for the provision of these funds <br /> and/or facilities shall be approved by the PUSD and in place prior to building permit <br /> issuance. Written proof of compliance with this condition shall be provided by applicant <br /> to the City, on a form generated by the PUSD, prior to building permit issuance. <br /> 43. CONDITIONS OF APPROVAL: The applicant shall provide all initial buyers with copies <br /> of the final project conditions of approval. <br /> ENGINEERING DEPARTMENT — LAND DEVELOPMENT — 925-931-5650 <br /> Design <br /> 44. WATER CONNECTION: The existing residence shall be connected to City water system <br /> prior to recordation of the final map (PROJECT SPECIFIC CONDITION) <br /> 45. DESIGN PER CITY STANDARDS: All public improvements shall be designed in <br /> compliance with the City Standard Specifications and Details in effect at the time of the <br /> issuance of the encroachment, grading, or subdivision permit, whichever occurs first. <br /> 46. CONDITIONS OF APPROVAL: The Conditions of Approval shall be depicted on a plan <br /> sheet(s) in the improvement plans. <br /> 47. GEOTECHNICAL CONSULTANT: The applicant shall comply with the recommendations <br /> of the project geotechnical report. The applicant's California licensed geotechnical <br /> engineer shall review and approve all foundation, retaining walls, drainage and <br /> geotechnical aspects of the final grading and improvement plans and shall certify on the <br /> plans or as otherwise acceptable to the Director of Engineering/City Engineer that the <br /> plans are in general compliance with the recommendations of the project geotechnical <br /> report. The applicant shall bear all costs for work related to this condition by their <br /> geotechnical engineer. <br /> 48. HYDRAULIC CONSULTANT: The applicant shall comply with the recommendations of <br /> the project hydraulic report. The applicant's structural engineer shall design all <br /> foundations. retaining walls, of the final grading and improvement plans. The applicant <br /> shall bear all costs for work related to this condition by their geotechnical engineer. <br /> 49. IMPROVEMENT PLANS: The applicant's California licensed civil engineer shall prepare <br /> improvement plans that include the plan and profile of all proposed streets: typical and <br /> PUD-135 City Council <br /> Page 9 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.