Laserfiche WebLink
Resolution No. PC-2003-48 <br />Page 10 <br />47. Portable toilets used during construction shall be kept as far away as <br />possible from adjacent properties and shall be emptied on a regular basis as <br />necessary to prevent odor. <br />48. Prior to issuance of a building permit, the developer shall pay the required <br />commercial development school impact fee as prescribed by state law and <br />as adopted by the Pleasanton Unified School District. <br />49. All building and/or structural plans must comply with all codes and <br />ordinances in effect before the Building Department will issue permits. <br />50. The project developer shall submit a building survey and/or record of <br />survey and a site development plan in accordance with the provisions of <br />Chapter 18.68 of the Municipal Code of the City of Pleasanton. These <br />plans shall be approved by the Chief Building Official prior to the issuance <br />of a building permit. The site development plan shall include all required <br />information to design and construct site, grading, paving, drainage, and <br />utilities. Specific items to be indicated on the site development plan <br />necessary to construct the improvements are to be in accordance with the <br />City of Pleasanton Private Development Design Guidelines adopted April <br />15, 1986. <br />51. Unless otherwise waived by the Chief Building Official, the paving <br />sections for the on-site parking and drive areas shall be designed on the <br />basis of an R-Value test and a traffic index to carry the anticipated traffic <br />loads. This design shall be subject to the approval of the Chief Building <br />Official. The minimum paving section shall be 2" A.C. on 6" of A.B. The <br />minimum A.C. pavement slope shall be 1 %. For pavement slopes of less <br />than 1%, the surface runoff shall be carried in a concrete gutter to an <br />acceptable point of discharge. The minimum slope for concrete gutter shall <br />be 0.5%. <br />52. A sanitary sewer-sampling manhole shall be provided on each of the <br />sanitary sewer lateral from each building, unless otherwise waived by the <br />Chief Building Official. <br />53. Prior to issuance of a building permit, the project developer shall pay the <br />applicable Zone 7 and City connection fees and water meter cost for any <br />water meters, including irrigation meters. Additionally, the developer shall <br />pay any applicable DSRSD sewer permit fee. <br />