or grinding of the entire street surface is necessary on streets where performing an OL <br /> would raise the crown and increase the cross slopes, particularly along the parking lane, <br /> to an unsatisfactory level <br /> Pavement Milling and Filling (Mill/Fill): This construction method involves the removal of <br /> the existing asphalt concrete layer and base material by cold-plane milling, then <br /> applying 3 inches of HMA. This method of repair is used on streets where the existing <br /> pavement surface is so distressed that it must be completely removed down into the <br /> aggregate base prior to street reconstruction. The paving operation generally takes <br /> place the same day of the milling operation. <br /> STREET NAME BEGIN LOCATION END LOCATION AREA TREATMENT <br /> SANTA RITA RD WEST LAS POSITAS BLVD OLD SANTA RITA RD 94,025 OUF <br /> SANTA RITA RD STONERIDGE DR WEST LAS POSITAS BLVD 152,990 OUF <br /> SANTA RITA RD STONERIDGE DR MOHR AVE 220,195 OUF <br /> ANDREWS DR OWENS DR OLD SANTA RITA RD 85,123 OL <br /> APACHE DR WEST LAS POSITAS BLVD END/CROW CT/APACHE CT 13,783 MILUFILL <br /> APACHE CT APACHE DR END 10,672 MILUFILL <br /> CROW CT APACHE DR END 10,503 MILL/FILL <br /> MOHR AVE SANTA RITA RD KOLLN ST 21,000 OL <br /> MOHR AVE KOLLN ST OLD RR XING 23,766 OL <br /> MOHR AVE OLD RR XING KAMP DR 22,000 OL <br /> MOHR AVE KAMP DR 400FT E/O NURSURY DR 35,000 OL <br /> FIRST ST VINEYARD AVE W/O STANLEY BLVD 65,848 OUF <br /> STANLEY BLVD W/O STANLEY BLVD CALIFORINA AVE 140,216 OUF <br /> ALVARADO ST SANTA RITA RD(FRONTAGE) KOLLN ST 37,283 OUF <br /> GRAHAM ST SANTA RITA RD(FRONTAGE) KOLLN ST 38,987 OUF <br /> SCHOOL ST SANTA RITA RD(FRONTAGE) KOLLN ST 40,830 OL <br /> JENSEN ST SANTA RITA RD(FRONTAGE) KOLLN ST 43,011 OL <br /> KOLLN ST NEVIS ST JENSEN ST 33,625 OUF <br /> SANTA RITA RD FRANCISCO ST S/O WELLS ST 50,344 OUF <br /> FRONTAGE <br /> SANTA RITA RD S/O WELLS ST S/O JENSEN ST 35,806 OUF <br /> FRONTAGE <br /> WEST ANGELA ST MAIN ST FIRST ST 22,167 OL <br /> NEAL ST MAIN ST FIRST ST 32,358 MILUOL <br /> BLACK AVE CRESTLINE RD GREENWOOD RD 85,876 OUF <br /> SUTTERGATE SANTA RITA MOHR AVE 90,870 OUF <br /> The second component of the project consists of preparatory work for approximately 2.1 <br /> million square feet of roadway scheduled for slurry sealing later this year. This work <br /> consists of crack sealing and/or pavement repair, as necessary. Crack sealing involves <br /> cleaning the pavement cracks in preparation for applying a joint sealant and smoothing <br /> the applied sealant so that the material is flush with the existing asphalt concrete <br /> surface. Pavement repair involves removing 4 to 6 inches of the existing pavement <br /> section down to the roadway aggregate base material and replacing it with new asphalt <br /> concrete with the same thickness that was removed. This is done when the pavement <br /> has failed in isolated areas and before the entire street surface is slurry sealed. <br /> Page 3 of 7 <br />