My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
061620
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 11:01:02 AM
Creation date
6/11/2020 11:01:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cold-in-Place Recycling and Overlay (CIR/OL): The CIR process includes pulverizing <br /> (milling) the top 4 inches of the existing pavement, mixing the pavement with asphalt <br /> binder/cement agents, grading and compacting by paving machine, and applying a fog <br /> seal. After completion of the CIR process, 1.75 to 2 inches of HMA will be applied on <br /> top of the newly recycled pavement surface. This treatment is normally utilized on <br /> streets that are in poor condition and require total reconstruction, including a complete <br /> removal and replacement of the asphalt concrete layer along with stabilization of the <br /> existing base material. Total reconstruction is a very costly and lengthy process, which <br /> creates a major impact to traffic and residents. The City successfully completed the CIR <br /> treatment on the past two projects in 2017 and 2018 and proved the use of CIR as a <br /> cost-saving alternative treatment in-lieu of a total reconstruction, while also minimizing <br /> the impact to traffic. <br /> STREET NAME BEGIN LOCATION END LOCATION AREA TREATMENT <br /> WILLOW RD OWENS DR GIBRALTAR DR 70,289 MILUOL <br /> HACIENDA DR OWENS DR GIBRALTAR DR 171,870 OUF <br /> HACIENDA DR END OF 1-580 ON&OFF OWENS DR 148,826 OL/F <br /> RAMPS <br /> CHABOT DR OWENS DR STONERIDGE DR 158,535 OL <br /> CHABOT DR STONERIDGE DR INGLEWOOD DR 49,055 OL <br /> GIBRALTAR DR HACIENDA DR STONERIDGE DR 77,106 OL <br /> OWENS DR ANDREWS DR WEST LAS POSITAS BLVD 56,400 CIR/OL <br /> STONERIDGE DR GIBRALTAR 1560'E/O GIBRALTAR 197467 CIR/OL <br /> Bids <br /> Sealed bids for this project were virtually opened on May 13, 2020. There were seven <br /> bids received, ranging from the low bid amount of$2,399,865 to $2,961,688.90. The low <br /> bid amount is approximately 13 percent lower than the Engineer's Estimate of <br /> $2,775,412 (see Attachment 3). Past work performed by Goodfellow Bros. LLC was <br /> verified to be satisfactory. Staff recommends award of the construction contract to the <br /> lowest responsible bidder, Goodfellow Bros. LLC, for $2,399,865. <br /> Consultant Services: <br /> Consulting testing services for $30,000 will be provided under existing on-call materials <br /> testing contracts. The testing services are required to provide specialty testing of the <br /> materials and density checks in conformance with the City's Quality Assurance Program <br /> for paving. <br /> Traffic Equipment: <br /> Signalized intersections within the project limits without cameras will have cameras <br /> installed to maintain control of the intersection when the control loops are temporarily <br /> cut during construction. The traffic cameras will be installed utilizing the City's existing <br /> on-call contractor, Econolite, prior to the start of the project for $35,422. <br /> Budget <br /> Project funding totals $1,800,000, with $150 expended to date. The total estimated <br /> project expenditure is $2,77,419, leaving a project shortfall of$977,419. Staff <br /> recommends appropriating $375,000 of additional OBAG 2 grant funding and allocating <br /> $602,419 from the Streets CIP fund to cover the project shortfall (see Attachment 1). <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.