Laserfiche WebLink
frv*,_ TiRc <br /> CITY OF PLEASANTON I Construction Management Services for Bridge Preventative Maintenance Program(BPMP)of Various Bridges <br /> .Position Name Rate ' Jan Jan Jan Jan Jan Jan Jan Jan Jan I Hours Totals <br /> 5. Owens Drive Bridge(33C-0462) �.� <br /> 'Contract Manager/Project Manager Rany Chek,PE $ 386 90 __ 1 1 _1 1 4 $ 1,547 60 <br /> Resident Engineer Bonaventure Ezeji.PE $ 229 92 5 10 10 5 5 35 $ 8.047 20 <br /> •Construction Inspector(Day ST) Naji Chidiac $ 176 30 20 20 20 60 $ 10,578 00 <br /> •Construction Inspector(Day OT) Na))Chidiac $ 231 17 _ 0 <br /> Annual Escalation 3% <br /> �_ A SUBTOTAL:LABOR $ 20.172 80 <br /> Company Vehicles($747 10/mo,pro-rated) hour $ 4 31 6 31 31 26 5 99 $ 4.26 69 <br /> Personal vehicles(mileage(I IRS rate) mile $ 0 575 0 $ - <br /> Prevailing Wage Subsistence(if applicable) DIR Rate $ 120 00 0 $ <br /> Per Diem(if applicable) Caftans Travel Guide $ 0 $ <br /> Ya <br /> Document Control Software'ProCore(if used) month $ 350 00 0 $ - <br /> FCCM %Labor 0 31% 7.898 53 $ 24 48 <br /> SUBTOTAL:ODC's $ 451.17 <br /> SUBTOTAL 5. Owens Drive Bridge(33C-0462): $ 20,623.97 <br /> TOTAL OF CONTRACT $ 149,957.89 <br /> Notes and Assumptions: <br /> •Fees are based on an approximate 7 month construction duration with Contractor NTP anticipated in April 2020 <br /> •Should the actual schedule require more or less professional services than proposed adjustments to this estimate may be required. <br /> •3%annual escalation one year from RFQ date,effective 02/12/2021 <br /> •Above rates are straight-time rates. Overtime,rain,holidays and potential time extensions or delays may result in additional professional services <br /> -Night work and Overtime will be billed at a pro-rata adjusted rate <br /> •Wages for inspection subject to Calif.Labor Code Section 1772 <br /> •Rates are based on DIR Prevailing Wage Determination NC-63-3-9-2018-2 TRC will pay and bill accordingly <br /> •Denotes employees/classifications that are subject to prevailing wage <br /> •This estimate is based on specific scope of work assumptions <br /> •Client will be billed only for hours worked <br /> RC City of Pleasanton I CM Services for Bridge Preventative Maintenance Program I Page 2 of't <br />