Laserfiche WebLink
Chair Ritter discussed the components of the project he liked, including incorporating the <br /> residential into the rezoning, which gives one complete look for the entirety of the project. He <br /> also appreciates that the project maintains the overall allowable density, meeting the <br /> objectives, without too many variances. <br /> Commissioner Allen concurred with Chair Ritter and expressed her full support for the <br /> integrated approach. She expressed appreciation towards staff and the applicant in looking at <br /> an integrated strategy, which makes sense for the community. <br /> Commissioner Balch dittoed the previous Commissioners and commented about density, <br /> stating at some point density can lead to a project's infeasibility. However, stated he wanted to <br /> be flexible and believes this project is meeting the requirements. <br /> Commissioner Brown expressed his uncertainty stating he was becoming amenable towards <br /> the integrated plan but had some concerns. He expressed there are benefits in the existing <br /> approved plan and stated the only benefit he's currently seeing in the revised plan is towards <br /> the fitness amenity and the decision to move the fitness amenity to the residential portion of <br /> the project. However, he expressed he still has concerns surrounding the overall project <br /> design and traffic circulation in the integrated plan. <br /> Commissioner O'Connor indicated he also had concerns similar to Commissioner Brown. He <br /> expressed he's amenable to the concept of integrating the housing with the commercial <br /> component of the project. However, he was also concerned with traffic circulation and how <br /> residents will have to pass through the commercial area in order to reach their residences. He <br /> also referenced his concern regarding the massing, specifically the wrap-building and how it <br /> overshadows the mall. <br /> Commissioner Pace asked and clarified the reason for the exemption being sought is to modify <br /> both the currently zoned residential and commercial in order to create more mixed use, which <br /> he stated is simply a design feature of how to mesh the two components together and create a <br /> community and lifestyle, especially for the future residents of the site. He stated he liked the <br /> integration concept and indicated support for mixed use. <br /> Ms. Clark confirmed that the rezoning is required because the current mall zoning does not <br /> allow for residential use. <br /> Commissioner Allen asked about traffic circulation issues. <br /> City Traffic Engineer Mike Tassano discussed the amount of traffic generated from the mall <br /> and referenced the volume of employees and vehicles associated with the Workday site. He <br /> further mentioned the congestion at the intersection of Stoneridge Drive and Stoneridge Mall <br /> Road, especially in the evening hours when vehicles are exiting from the mall, Workday <br /> campus, and surrounding offices. He expressed his concerns and stated the need for a traffic <br /> study. He mentioned the traffic model from 2012, which already included 400 homes and <br /> 380,000 square feet of future retail for this area, so both of these elements were already <br /> approved and accounted for increased congestion. He discussed the pedestrian and bicycle <br /> traffic and the future amenities, including the cycle track, which would help improve circulation. <br /> Planning Commission Minutes Page 6 of 9 March 11, 2020 <br />