My WebLink
|
Help
|
About
|
Sign Out
27
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
061620
>
27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 11:45:09 AM
Creation date
5/28/2020 2:12:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> . Print Clear Form <br /> City of Pleasanton <br /> Sole Source Justification <br /> Sole source purchases are goods and services available from only one suppker/vendor or meets the listed criteria.Purchases for items that cannot be <br /> procured through the competitive bidding process must be documented as to why the item(s)is considered sole source. <br /> (Requester Name Todd Yamello irtieAssistant Director of OperatlDept:OSD <br /> i <br /> Requested Sole Source Company:PUmp Repair Service <br /> Contact Name:Wayne Archer jEmail:Warcherapumprepairservi Phone:415-467-2150 I <br /> Address:PO Box 34327, San Francisco, CA 94134 - <br /> Description of Product or Service: <br /> Refurbishment of Well 5 pump and motor including installation. <br /> Project Schedule(when do you need the product or service by?):6/30/2020 Estimated costal 01,825 <br /> Complete the following checklist: This is a sole source vendor because: <br /> Sole provider of a licensed or patented good or service. <br /> Sole provider of items that are repair parts of or updates to existing equipment systems. <br /> [1 <br /> Sole provider of factory-authorized warranty service. • <br /> Sole provider of unique equipment,products and/or services not offered by others.Please provide brief explanation. <br /> ®Only company available to provide service and/or supplies to meet project schedule.In a brief explanation,provide supporting evidence of <br /> why other contractors are considered to be unable to meet theroject schedule. <br /> Pump repair service can meet the project schedule to do this Emergency Repair work where time is of <br /> essence based on past performance. <br /> 0 There is a substantial technical risk in contracting with any other contractor, (e.g.,only one contractor has been successful to date in <br /> implementing a difficult manufacturing process). In a brief explanation,provide supporting evidence that explains why other contractors am <br /> considered to be unable to overcome the substantial technical risk. <br /> . <br /> Li There is no reasonable expectation that a meaningful cost or other improvement could be realized over the incumbent contractor's . <br /> performance(e.g.,the changes of another firm winning a competition are dearly remote.Please provide a brief explanation. <br /> r • <br /> What steps were taken to verify that these features are not available elsewhere? . . <br /> Other brands/manufacturers/companies were examined(List-specific company names,phone number and contact names,and explain why <br /> these were not suitable). <br /> • <br /> Other vendors were contacted(List specific company names,phone numbers and contact names,and explain why these were not suitable). <br /> • <br /> What specific feature makes this item and/or company unique:and why is this needed for your project? • <br /> Repair of Well 5 is an emergency project. Refurbishment of existing pump/motor can only be performed <br /> by Pump Repair who is original supplier. Refurbishment (vs. new) saves about 10 weeks on schedule <br /> Requestors Signature: fto <br /> Date: 4 /211 <br /> Department Head Signature: \ 4 Date: 1\124' <br /> rDirector of Finance Mr.proval: � . Date: C./ <br /> <id <br />
The URL can be used to link to this page
Your browser does not support the video tag.