Laserfiche WebLink
f. No stockpiling/storage of construction materials, fill, etc., shall take place underneath or <br /> within 5-feet of the dripline of the existing trees. <br /> g. No equipment or temporary structures shall be placed within or beneath the dripline of the <br /> existing trees. <br /> Failure to comply with these requirements may result in a "stop work order". <br /> 127. SITE LIGHTING: All site lighting shall be Dark Sky Compliant and shall be subject to review and <br /> approval by the City Landscape Architect prior to building permit issuance. <br /> OPERATIONS SERVICES DEPARTMENT — ENVIRONMENTAL SERVICES/UTILITIES DIVISION — <br /> 925-931-5500 <br /> 128. SEWER LINE: The sewer line shall be private from sewer mains on Sycamore Creek Way and <br /> Sycamore Road into the development. Prior to building permit submittal, the project plans shall be <br /> revised to reflect this requirement. <br /> 129. BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall be designed <br /> and installed in accordance with current City Standard 706; State Health and Safety Code; Title <br /> 17; and as required by the Director of Operations and Water Utilities. All backflow preventer <br /> assemblies shall be tested and certified by a City approved tester with the certification submitted <br /> to the City's contractor, Aqua Backflow. Testing will be performed at the time City water is turned <br /> on to the site. If an existing backflow preventer is on the site it shall be tested and certified by an <br /> approved tester with the certification submitted to the City's contractor, Aqua Backflow, before <br /> project water is drawn through it. An all-weather cover shall be placed over all backflow <br /> prevention assemblies 4 inch and smaller. <br /> TRAFFIC ENGINEERING DIVISION — 925-931-5677 <br /> 130. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be submitted to the <br /> City Traffic Engineer for review and approval. Best management practices to minimize traffic <br /> impacts shall be used during construction, including scheduling of major truck trips and deliveries, <br /> to avoid peak travel hours. The TCP shall have proper lane closure procedures such as flagger <br /> stations, signage, cones, and other warning devices implemented during construction. The TCP <br /> shall also include time of day/hours of lane closures and total number of days. <br /> 131. TRUCK ROUTES: The haul route for all materials to and from the project site shall be reviewed <br /> and approved by the City Traffic Engineer prior to building permit issuance and shall include the <br /> provision to monitor the street surfaces used for the haul route so that any damage and debris <br /> attributable to the haul trucks is identified and corrected at the expense of the applicant. <br /> [end] <br /> PUD-135, P19-0030. P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 21 of 21 <br /> utility trenches outside of the existing canopy of the <br /> trees to be saved. If this is not feasible, the applicant shall submit a report from a certified <br /> arborist acceptable to the City indicating trenching will not be detrimental to the health of <br /> the tree. <br /> c. Nothing may be stored within the dripline of the tree canopies. This includes equipment, <br /> oil, gas, chemicals, harmful materials, fill or storage. <br /> d. No oil, gasoline, chemicals, or other harmful materials shall be deposited or disposed <br /> within the dripline of the trees or in drainage channels, swales, or areas that may lead to <br /> the dripline. <br /> e. No sign, wires, or ropes shall be attached to the trees. <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 20 of 21 <br />PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 19 of 21 <br />type and locations of HM controls to be installed, <br /> sizing calculations using Bay Area Hydrology Model (BAHM). The Stormwater Management Plan <br /> shall be subject to review and acceptance by the Director of Engineering/City Engineer, prior to <br /> issuance of an engineering or building permit, whichever occurs first. Stormwater HM controls <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 14 of 21 <br />