My WebLink
|
Help
|
About
|
Sign Out
5_Exhibits A-G
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2020
>
05-27
>
5_Exhibits A-G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 3:27:16 PM
Creation date
5/20/2020 3:26:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/27/2020
Document Relationships
5
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2020\05-27
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
110. WATER EFFICIENT LANDSCAPE ORDINANCE (WELD): The project shall comply with the City <br /> of Pleasanton's Water Efficient Landscape Ordinance (WELO) and Bay Friendly Basics <br /> Landscape Checklist. The applicant shall submit a Landscape Documentation Package in PDF <br /> format to the Landscape Architecture Division, which shall be subject to review and approval by <br /> the City Landscape Architect prior to building permit issuance. The Landscape Documentation <br /> Package shall include: <br /> a. Project Information; <br /> b. Water Efficient Landscape Worksheet; <br /> c. Soil management report; <br /> d. Landscape design plan; <br /> e. Irrigation design plan; and <br /> f. Grading design plan. <br /> 111. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final inspection <br /> by the Building and Safety Division, the applicant's landscape architect shall submit a Certificate <br /> of Completion Package in PDF format to the Landscape Architecture Division for review and <br /> approval. The Certificate of Completion Package shall include: <br /> a. Project information sheet; <br /> b. Certificate of installation according to the landscape documentation package; <br /> c. Irrigation scheduling; <br /> d. Schedule of irrigation, landscape and irrigation maintenance; <br /> e. Landscape irrigation audit report; and <br /> f. Soil management report (if not previously submitted). <br /> 112. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be installed as <br /> shown on the approved building permit set and shall be inspected and approved by the <br /> Landscape Architecture Division. <br /> 113. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs with wheel <br /> stops, if determined to be acceptable by the Director of Engineering/City Engineer and Director of <br /> Community Development, shall be installed between all paved and landscape areas, in <br /> conformance with the City's Standard Specifications and Details. <br /> 114. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro seed <br /> mixture designed by the applicant's landscape architect and approved by the Landscape <br /> Architecture Division prior to installation. The erosion control shall be maintained by the applicant <br /> until permanent landscaping is in place. <br /> 115. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices, above <br /> ground irrigation controls, and above ground irrigation meters shall be located and screened to <br /> minimize their visual impacts. These devices with their proposed screening shall be shown on the <br /> landscaping and utility plans submitted with the building permit plans or improvement plans, <br /> clearly marked "above ground" or "below ground" on the plans, and shall be subject to the review <br /> and approval of the City Landscape Architect prior to their installation. If above-ground, they shall <br /> be painted forest green or an equivalent dark-green color. Screens shall consist of berms, walls, <br /> or landscaping satisfactorily integrated into the landscape plan. Landscape screens shall include <br /> shrubbery designed by species and planting density to establish a complete screen within 1 year <br /> from the date of planting. Weather protection devices, such as measures to protect pipes from <br /> freezing, shall require approval by the City Landscape Architect prior to use; at no time shall <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 18 of 21 <br /> <br /> Page 17 of 21 <br />on soil certification form completed and certified by the applicant's soil supplier. <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 15 of 21 <br />n, prepared by a <br /> California licensed civil engineer, indicating the type and locations of HM controls to be installed, <br /> sizing calculations using Bay Area Hydrology Model (BAHM). The Stormwater Management Plan <br /> shall be subject to review and acceptance by the Director of Engineering/City Engineer, prior to <br /> issuance of an engineering or building permit, whichever occurs first. Stormwater HM controls <br /> PUD-135, P19-0030, P19-0031 and VTM 8528 Planning Commission <br /> 990 Sycamore Road <br /> Page 14 of 21 <br />