My WebLink
|
Help
|
About
|
Sign Out
GHAD
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
051920
>
GHAD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 3:17:05 PM
Creation date
5/14/2020 3:17:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/19/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing GHADs within the City of Pleasanton <br /> There are currently four GHADs within the city: Laurel Creek Estates (The Preserve, <br /> Oak Hill Estates and Kolb Ranch Estates), Moller Ranch, Lemoine Ranch Estates, and <br /> Oak Tree Farm. The Oak Hill Estates and the Kolb Ranch Estates subdivisions were <br /> both annexed into the Laurel Creek Estates GHAD after the formation of the original <br /> district, which included only The Preserve neighborhood; those annexations occurred <br /> on August 1, 2000, and July 20, 2004, respectively. All of the four existing GHADs are <br /> located on the west side of Foothill Road and are in areas where potential geologic <br /> hazards exist. All four of the GHADs were created prior to the passage of Proposition <br /> 218 in November of 1996 and have a built-in escalation factor to compensate for <br /> inflation: the Engineering News Record (ENR) Construction Cost Index for the San <br /> Francisco Bay Area. <br /> DISCUSSION <br /> 2020-2021 Proposed Assessments <br /> The annual assessments can be adjusted each year by the ENR Construction Cost <br /> Index for the San Francisco Bay Area. The current index allows for an increase of more <br /> than four percent, but will be held at two percent. The allowed ENR adjustment is stated <br /> within each GHAD's original creation document and is therefore compliant with <br /> Proposition 218. <br /> Laurel Creek Estates <br /> The Engineer's Report for the Laurel Creek Estates GHAD concludes that funding is <br /> needed for the following special services for properties within this GHAD in the coming <br /> year: remove debris within drainage ditches, repair manhole structure, stabilize slopes, <br /> perform erosion control, conduct routine maintenance, inspect site, prepare the <br /> Engineer's Report, and manage City administrative costs. This year, staff recommends <br /> increasing the annual parcel assessment by two percent to $400. There are 121 <br /> properties within the GHAD (102 in Laurel Creek Estates, including the two City-owned <br /> water reservoir sites; seven in Oak Hill Estates and 12 in Kolb Ranch Estates). This <br /> year's projected revenue will be $61,400. The anticipated operational expenses this <br /> year will total $40,236, leaving $21,164 to be deposited into the fund reserve. <br /> As of May 1, 2020, the Laurel Creek Estates CHAD has a fund reserve of$933,483. <br /> The reserve assumes the potential for a significant repair of the hillside slopes once <br /> every ten years. These reserves can also be used for the eventual replacement of slope <br /> stabilization infrastructure, should it be necessary. Based upon some experience with <br /> the cost of landslide repairs in this area west of Foothill Road, staff believes this reserve <br /> amount to be appropriate but is still concerned about whether it will actually cover the <br /> cost of needed repairs, should a significant landslide occur. <br /> Moller Ranch <br /> The Engineer's Report for the Moller Ranch GHAD concludes that funding is needed for <br /> the following special services for properties within this GHAD in the coming year: repair <br /> hillside erosion, mitigate wildlife burrowing activity, clean debris from drainage ditches <br /> and inlets, seal cracks in drainage ditches, trim vegetation, inspect site, prepare the <br /> Engineer's Report, and manage City administrative costs. This year, staff recommends <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.