My WebLink
|
Help
|
About
|
Sign Out
PC-2003-33
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2003
>
PC-2003-33
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 9:33:52 AM
Creation date
3/24/2004 9:14:18 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/13/2003
DOCUMENT NO
PC-2003-33
DOCUMENT NAME
PUD-81-30-64D-2M
NOTES
ROCHE MOLECULAR DIAGNOSTICS
NOTES 3
71 ADDL PARK SPACES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2003-33 <br />Page 12 <br />66. Prior to the commencement of any cleazing, grading, or excavation, the project developer <br />shall submit a copy of the State Water Resources Control Board Notice of Intent (NOI) <br />for coverage under the State Construction Storm Water General Permit. <br />67. Prior to the commencement of any clearing, grading, or excavation, the project developer <br />shall obtain the Construction Activities Storm Water General Permit from the State Water <br />Resources Control Boazd. <br />68. The project developer shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of building <br />and/or grading permits. These BMP's shall be implemented by the general contractor and <br />all subcontractors and suppliers of materials and equipment. Construction site cleanup <br />and control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. The project developer is responsible for implementing the following <br />measures during all construction phases of the project: <br />a. Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed an a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to storm <br />water runoff pollution. <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather. Broom sweep the street pavement adjoining the <br />project site on a daily basis. Scrape caked-on mud and dirt from these areas before <br />sweeping. <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />neazest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being windblown <br />or in the event of a material spill. <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br />£ Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br />dischazge wash water into street, gutters, or storm drains. <br />
The URL can be used to link to this page
Your browser does not support the video tag.