My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
042120
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 4:35:32 PM
Creation date
4/17/2020 4:35:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2020
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
immediate attention. PG&E backfilled its excavations, repaved the trench line, and <br /> contributed $50,000 toward the pavement overlay work. <br /> 4. A decrease of$10,695 in accordance with the contract specified payment <br /> adjustment formula due to an overall reduction in the Oil Price Index. <br /> 5. An increase of $43,365 for a balancing change order as the result of contract <br /> quantities constructed (such as tons of asphalt placed) as compared to the <br /> Engineer's Estimate of quantities within the bid documents. <br /> The work has been completed to the Director of Engineering's satisfaction and it is <br /> recommended that the project be accepted as complete. <br /> Submitted by: Fiscal Review: Approved y: <br /> Stephen Ki p r k Tina Olson Nelson Fialho <br /> Director of En ineering Director of Finance City Manager <br /> Attachment: <br /> 1. Funding and Expenditure Summary <br /> Page 5 of 5 <br />