Laserfiche WebLink
62. The project developer shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of building <br />and/or grading permits. These BMP's shall be implemented by the general contractor and <br />all subcontractors and suppliers of materials and equipment. Construction site cleanup <br />and control of construction debris shall also be addressed. Failure to comply with the ap- <br />proved construction BMP may result in the issuance of correction notices, citations, or a <br />stop work order. <br />63. The project developer is responsible for implementing the following measures during all <br />construction phases of the project, including public improvements and structures: <br />a. Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to <br />storm water runoff pollution. <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or grav- <br />eled areas during wet weather. Broom sweep the street pavement adjoining the <br />project site on a daily basis. Scrape caked-on mud and dirt from these areas before <br />sweeping. <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to en- <br />sure effectiveness and to prevent street flooding. <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being wind- <br />blown or in the event of a material spill. <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. <br />Ensure that concrete/gunite supply trucks or concrete/plaster operations do not discharge <br />wash water into street, gutters, or storm drains. <br />< End > <br />PUD-27, Conditions ofApprova! Page 9 of 9 per Planning Commission: June 25, 2003 <br />