Laserfiche WebLink
Significance After Mitigation: Less than Significant <br /> Finding: Changes have been incorporated into the Project that would avoid the <br /> significant environmental effect as identified in the Revised Final SEIR. <br /> Mitigation Measures 4.E-2 through 4.E-4, which have been incorporated into the <br /> Project, will reduce the significant environmental impact to a less than significant <br /> level. <br /> Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact will be reduced to less than significant. <br /> 1. Construction activities within the Project- specifically, reconstruction and <br /> widening of the freeway on-ramp bridge over the Alamo Canal - could <br /> affect wetlands and wetland habitat. <br /> 2. Implementation of Mitigation Measures 4.E-2 through 4.E-4 set forth in <br /> Table 5-1 of the Final SEIR and listed in the RMMRP will ensure that <br /> Impact 4.E-lc will be reduced to a less than significant level and are <br /> hereby incorporated by reference and described below. <br /> Mitigation Measure 4.E-2: Wetland Delineation. In coordination with the City, a <br /> qualified wetland ecologist shall conduct a wetland delineation of the proposed <br /> bridge expansion and replacement site to identify potential waters of the United <br /> States (U.S.) (including wetlands) or waters of the state which may be present. If <br /> no waters of the U.S. or waters of the state are identified onsite, no further action <br /> is required. Should waters of the U.S. or waters of the state be determined present <br /> within the site, features shall be mapped and documented in a report for <br /> submission to the appropriate jurisdictional agencies retaining authority over the <br /> identified features. <br /> Site(s) affected: Proposed bridge expansion and replacement site. <br /> Mitigation Measure 4.E-3: Wetland Avoidance and Protection. Access roads, <br /> work areas, and infrastructure shall be sited to avoid and minimize direct and <br /> indirect impacts to wetlands and waters. Where work will occur within and/or <br /> adjacent to federal and state jurisdictional wetlands and waters,protection <br /> measures shall be applied to minimize the footprint of overall impacts and protect <br /> these features. These measures shall include the following: <br /> • A protective barrier(such as silt fencing) shall be erected around the work <br /> area(s)to minimize disturbance to wetland or water features and isolate <br /> adjacent to wetland or water features from construction activities to reduce <br /> the potential for incidental fill,erosion, or other disturbance beyond what <br /> is necessary for bridge expansion and replacement; <br />