My WebLink
|
Help
|
About
|
Sign Out
PC-2003-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2003
>
PC-2003-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 9:30:05 AM
Creation date
3/23/2004 12:37:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/26/2003
DOCUMENT NO
PC-2003-08
DOCUMENT NAME
PDR-265
NOTES
RICH THIELE
NOTES 3
DEMOLISH BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2003-08 <br />Page 7 <br />26. If signing for the development is desired, a comprehensive signing program shall be <br />submitted to the Planning Director for consideration under separate application. <br />27. Final inspection by the Planning Department is required prior to occupancy. <br />28. If archeological materials are uncovered during grading, trenching, or other on-site <br />excavation, all work on site shall be stopped and the City immediately notified. The <br />county coroner and the Native American Heritage Commission shall also be notified and <br />procedures followed as required in Appendix K of the California Environmental Quality <br />Act. A similar note shall appear on the improvement plans. <br />BUILDING <br />29. To help ensure that the office building is constructed as approved by the Planning <br />Commission, this project shall require extra Building Department inspections during the <br />construction phase of the office building. The applicant shall be responsible for any <br />additional Building Department fees associated with the inspections. The number of <br />extra inspections shall be determined by the Chief Building Official. <br />30. The project developer shall submit a waste management plan to the Building Department <br />prior to issuance of building or demolition permits. The plan shall include the estimated <br />composition and quantities of waste to be generated and how the project developer <br />intends to recycle at least 50% (fifty percent) of the total job site construction and <br />demolition waste measured by weight or volume. Proof of compliance shall be provided <br />to the Chief Building Official prior to the issuance of a final building permit. During <br />demolition and construction, the project developer shall mark all trash disposal bins <br />"trash materials only" and all recycling bins "recycling materials only". The project <br />developer shall contact Pleasanton Garbage Service for the disposal of all waste from the <br />site. <br />31. The developer shall pay any and all fees to which the property may be subject prior to <br />issuance of building permits. The type and amount of the fees shall be those in effect at <br />the time the building permit is issued. <br />32. Prior to issuance of a building permit, the developer shall pay the required commercial <br />development school impact Fee as prescribed by state law and as adopted by the <br />Pleasanton Unified School District. <br />33. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br />34. The project developer shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the Municipal <br />
The URL can be used to link to this page
Your browser does not support the video tag.