My WebLink
|
Help
|
About
|
Sign Out
PC-2003-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2003
>
PC-2003-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 9:30:05 AM
Creation date
3/23/2004 12:37:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/26/2003
DOCUMENT NO
PC-2003-08
DOCUMENT NAME
PDR-265
NOTES
RICH THIELE
NOTES 3
DEMOLISH BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2003-08 <br />Page 11 <br />This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br />City Engineer. <br />59. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site. <br />60. The project developer shall comply with the City's non-point storm drain ordinance. <br />61. The project developer shall submit a construction Best Management Practice (BMP) <br />program for review and approval by the Chief Building Official prior to issuance of any <br />building and/or grading permits. These BMP's shall be implemented by the general <br />contractor and all subcontractors and suppliers of materials and equipment. Construction <br />site cleanup and control of construction debris shall also be addressed in this program. <br />Failure to comply with the approved construction BMP may result in the issuance of <br />correction notices, citations, or a project stop work order. <br />62. The project developer is responsible for implementing the following measures during all <br />construction phases of the subject project: <br />a.) Gather all construction debris on a regular basis and place them in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use tarps <br />on the ground to collect fallen debris or splatters that could contribute to storm water <br />pollution. <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement, <br />and storm drains adjoining the project site. During wet weather avoid driving vehicles <br />off paved areas. <br />c.) Broom sweep the public street pavement adjoining the project site on a daily basis. <br />Caked-on mud or dirt shall be scraped from these areas before sweeping. <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />into the City storm drain system. Filter materials shall be maintained and/or replaced as <br />necessary to ensure effectiveness and to prevent street flooding. Dispose of filter <br />particles in the trash. <br />e.) Create a contained and covered area on the site for the storage of bags, cement, paints, <br />flammable, oils, fertilizers, pesticides, or any other materials used on the project site that <br />have the potential for being discharged to the storm drain system through being <br />windblown or in the event of a material spill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.