My WebLink
|
Help
|
About
|
Sign Out
PC-2003-06
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2003
>
PC-2003-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 9:29:49 AM
Creation date
3/23/2004 12:31:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/12/2003
DOCUMENT NO
PC-2003-06
DOCUMENT NAME
PRZ-07
NOTES
CITY OF PLEASANTON
NOTES 3
AMEND PMC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• ~~ ~ <br />A. The facilities shall use the best available control technolo_w to <br />reduce air pollution. <br />B. The facilities shall not create anv objectionable odors at anv <br />point located outside of the property plane where the facilities <br />are located. <br />C. The facilities shall not exceed a noise level of forty-five (45) <br />dBA at anv point on any residentially zoned property outside o_f <br />the property plane where the facilities are Located. <br />D. The facilities shall be co-generation or combined-cycle <br />facilities, if feasible. <br />E. Toxic and ha ardous chemicals shall not be routed through <br />existing or proposed residential neighborhoods. <br />F. In no case shall electricity generator facilities and fuel cell <br />facilities exceed forty-nine point nine (49.9) megawatts in size. <br />If there are electricity generator facilities and fuel cell facilities <br />on site in no case shall the aggregate wattage of the facilities <br />exceed forty-nine point nine (49.9) megawatts in size. <br />G. The fuel source for electricity generator facilities shall be <br />natural gas bio diesel or the by product of an approved co- <br />generation or combined-cycle facility. <br />H. On a site with electricity generator facilities, medium fuel cell <br />facilities shall not be permitted unless the aggregate wattage of <br />the two facilities is either (i) ten (10) megawatts or less or, (ii) if <br />the aggregate wattage is greater than ten (10) megawatts. no <br />electricity is exported off site. If the aggregate wattage is <br />greater than ten (10) megawatts in size and some electricity is <br />exported off site the fuel cell facilities shall be subiect to all <br />reauirements and processes prescribed in this Title for large <br />fuel cell facilities in the applicable zoning district <br />I. On a site with fuel cell facilities, medium electricity generator <br />facilities shall not be permitted unless the aggregate wattage of <br />the two facilities is either (i) ten (10) megawatts or less or, (ii) if <br />the aggregate wattage is greater than ten (10) megawatts, no <br />electricity is exported off site. If the aggregate wattage is <br />nreater than ten (10) megawatts in size, and some electricity is <br />exported off site the electricity generator facilities shall be <br />subiect to all requirements and processes prescribed in this <br />Title for large fuel cell facilities in the applicable zonitzg <br />district <br />J. If the facilities are large electricity generator facilities, the <br />facilities shall be designed such that there is zzo wastewater <br />discharged into the sewer system. <br />Page 41 <br />Draft Ordinance for Case PRZ-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.