Laserfiche WebLink
d. The facilities shall not exceed a noise level of forty-five (45 dBA) <br />at any point on any residentially zoned property outside of the <br />property plane where the facilities are located: and <br />e. On a site with fuel cell facilities, small electricity generator <br />acilities shall not be permitted unless the aggregate wattage of <br />the two facilities is less than one (I) megawatt Ifthe aggregate <br />wattage of the two facilities is one (I) megawatt or greater, the <br />small electricity generator facilities shall be subiect to all <br />reauirements and processes prescribed in this Title For medium <br />or large electricity generator facilities. whichever is the most <br />applicable, in the subiect zoning district: <br />~ The facilities shall be co-generation or combined-cycle <br />facilities. if feasible. <br />4. Small fuel cell facilities that meet the following criteria: <br />a. The facilities shall not create any obiectionable odors at any <br />point outside ofthe property plane where the facilities are <br />located: <br />b. The fuel cell facilities shall not exceed a noise level of forty-five <br />(45) dBA at any point on any residentially zoned property <br />outside of the property plane where the facilities are located: <br />and <br />c. On a site with electricity generator facilities, small fuel cell <br />acilities shall not be permitted unless the aggregate wattage of <br />the two facilities is less than one (I) megawatt Ifthe aggregate <br />wattage of the two facilities is one (1) megawatt or greater, the <br />small fuel cell facilities shall be subiect to all reauirements and <br />processes prescribed in this Title for medium or large fuel cell <br />acilities. whichever is the most applicable. in the subiect <br />zoning district: <br />Small fuel cell facilities are encouraged to be co-generation or <br />combined-cycle facilities. <br />Page 19 <br />Draft Ordinance for Case PRZ-7 <br />