My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
020420
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 4:11:49 PM
Creation date
1/28/2020 4:11:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF 4 <br /> CITY COUNCIL AGENDA REPORT <br /> pLEASANTON <br /> February 4, 2020 <br /> Community Development <br /> Traffic Engineering Division <br /> TITLE: INTRODUCTION OF ORDINANCE AMENDING TITLE 11, CHAPTER 11.20, <br /> SECTION 11.20.010 OF THE PLEASANTON MUNICIPAL CODE <br /> CHANGING THE SPEED LIMIT ON STONERIDGE DRIVE FROM 35 MPH <br /> TO 40 MPH AND ESTABLISHING A 40 MPH SPEED LIMIT ON EL <br /> CHARRO ROAD <br /> SUMMARY <br /> The City reviews and updates speed limits on a yearly basis to ensure that the posted <br /> limit provides the most orderly movement of traffic in a safe and efficient manner and <br /> that all posted limits conform to the requirements outlined in the California Vehicle <br /> Code, including those requirements related to the setting of legal speed limits. <br /> RECOMMENDATION <br /> Adopt the ordinance changing the posted speed limit on Stoneridge Drive between <br /> Kamp Drive and Trevor Parkway from 35 MPH to 40 MPH and establishing a 40 MPH <br /> posted speed limit on El Charro Road. <br /> FINANCIAL STATEMENT <br /> There is a one-time cost to replace the existing speed limit signs and pavement <br /> markings with new signs and legends displaying the updated speed limit. This cost is <br /> estimated at $2,000 and will be funded through the Annual Traffic Buttons and Line <br /> Markers Capital Improvement Project, CIP No. 20507. <br />
The URL can be used to link to this page
Your browser does not support the video tag.