My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
012120
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:13:59 PM
Creation date
1/15/2020 4:13:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/21/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No.2203 <br /> Page 28 <br /> 112. BIO-SWALE PLANTING AND IRRIGATION: The planting in the bio-swaleshall <br /> be a mixture of evergreen grasses and flowering shrubs subject to the review <br /> and approval of the City Landscape Architect. The irrigation for the trees and the <br /> shrubs in the bio-swale shall be on separate irrigation valves. (Project Specific <br /> Condition) <br /> OPERATIONS SERVICES DEPARTMENT —''ENVIRONMENTAL <br /> SERVICES/UTILITIES DIVISION'— 925-931-5500 <br /> 113. BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall <br /> be designed and installed in accordance with current:City'Standards 704, 705, <br /> 706; State`Health and.Safety Code; Title 17; and as required by the Director of <br /> Operations and.Water Utilities. All backflow preventer assemblies shall be tested <br /> and certifiedby a City approvedtester with the certification submitted to the <br /> City's contractor, Aqua Backflow. Testing will be,performed at the time City water <br /> is turned on to'the site. If an existing backflowpreventer is on the site.it shall be <br /> tested and certified by an approved tester with the certificationsubmitted`to the <br /> City's contractor, Aqua Backflow, before project water is drawn through it. An all- <br /> weather cover shall be placed over all backflow preventionassemblies.:4 inch <br /> and smaller. <br /> 114. FOG PROGRAM: All new food service establishments (FSEs) and all existing <br /> food service establishments with a building permit-valuationof$50,000 or more <br /> shall obtain a wastewater discharge permit from the,Director of Operations and <br /> Water Utilities and comply with the greaseinterceptor requirements as set forth <br /> in PMC Section 15.44. All other FSEs shall at a-minimum comply with the grease <br /> trap and wastewater-discharge permit requirements as set forth in PMC Section <br /> 15.44. <br /> 115. ° RECYCLED WATER: Recycled water should be used on site during the grading <br /> and construction period. However, under any declared stage of water shortage, <br /> recycled water must be used throughout the grading and construction period. <br /> 116. RECYCLED WATER USE REQUIREMENT: If the site is within the city's recycled <br /> water service,area (recycled water distribution system is along route to the <br /> proposed application), the irrigation system must be designed in accordance with <br /> the'City's Recycled.Water Use Guidelines and Recycled Water Irrigation <br /> Standards,-per PMC Section 14.06. Refer to PMC Section 14.20 for a list of <br /> exceptions. <br /> 117. RECYCLED WATER USE PERMIT: The applicant shall submit a Recycled <br /> WaterUse Permit application and package_;.(as outlined in the City's-Recycled <br /> Water Use Guidelines available online), to the Recycled Water Program (925- <br /> 931-5513). The Recycled Water Use Permit application and package shall be <br /> submitted concurrently with the building permit submittal-and shallbe <br /> conditionally approved by the Recycled Water Program prior to building permit <br /> issuance. Final approval by the Recycled Water Program is required before the <br />
The URL can be used to link to this page
Your browser does not support the video tag.