My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
012120
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:13:59 PM
Creation date
1/15/2020 4:13:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/21/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No.2203 <br /> Page 25 <br /> d. Schedule of-irrigation, landscape and irrigation maintenance; <br /> e.' Landscape irrigation audit report; and <br /> f. Soil management report (if not previouslysubmitted). <br /> 98. LANDSCAPING.INSTALLATION: Prior to building-permit final all landscaping: <br /> shall be installed,as shown on the approved building permit set and shall be <br /> inspected and approved by the Landscape Architecture Division.•: ., <br /> 99. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs <br /> with wheel stops, if;determined to be acceptable by,the:Director of <br /> Engineering/City-Engineer and Director of Community.,Development, shall be <br /> installed between all paved and landscape areas, in conformance with the City's <br /> Standard Specifications and Details. . <br /> 100. . EROSION CONTROL: For purposes of erosion control, the applicant shall plant <br /> a'-hydro seed:mixture designed by the applicant's landscape architect and <br /> approved by;the Landscape Architecture Division prior to.installation. The erosion <br /> control shall be maintained by the applicant;until permanent landscaping is in <br /> place. . <br /> 101. BACKFLOW AND IRRIGATION METER SCREENING: All-backflow-prevention <br /> :_devices, above ground irrigation controls, and abovegroundirrigation meters <br /> --,shall be located and screened to minimize their visual impacts. These,devices <br /> with their_proposed screening-shall be,shown on the,landscaping and utility plans <br /> submitted with the building permit plans or improvement plans, clearly marked <br /> "above ground" or "below ground" on the-plans, and shallbe subject to the <br /> review and approval of the City Landscape Architect prior to their installation. If <br /> above-ground, they shall be painted forest green or an equivalent dark-green <br /> color. Screens shall consist of berms, walls, or landscaping satisfactorily <br /> integrated into the landscape-plan.,Landscape screens shall include shrubbery <br /> designed by species and plantingdensity to establish a complete screen within 1 <br /> year from the date of planting. Weather protection devices, such as measures to <br /> protect pipes from freezing, shall require approval by the City Landscape <br /> Architectprior to use; at no:-time shall,fabricor other material not designed and/or <br /> intended for this purpose be wrapped around or,otherwise placed on these <br /> devices.. <br /> 102., 'MAINTENANCE: The applicant and all future owners of the property shall, at no <br /> expense,to the,City, maintain all the landscaped areas related to the project in a <br /> healthful, attractive and reasonably weed-free mannerconsistent with the <br /> approved landscape plan,.for the duration of the existence of the project. <br /> Trees <br /> 103: -TREE- REPORT: The applicant shall comply with the-recommendations of the <br /> tree reportpreparedby Darya Barar, HortScience, dated August 18, 2016. No <br /> tree trimming or pruning other than that specified-in the tree report shall occur. <br /> The applicant shall arrange for the ProjectArboristto,conduct a field:.inspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.