Laserfiche WebLink
Attachment A <br /> Proposed Additional Landscape Architectural Services <br /> Lions Wayside DeLucchi Parks-Ph II Rkhard Larson Rebecca Colbert Kathy Gwllym Nathaniel Riody Laura Moran Moran Gootech Sub Direct <br /> Costa <br /> City of Pleasanton 12-04-19 Director Project Manager Civil Engineer Civil Engineer/ Project Associate Principal Restor'n AVG Engineers Utility Markup Sub <br /> Estimate <br /> H drolog s•cialist Services Totals ,citing S% ConaukaM 5%o/Fee <br /> Note:Items in 3a&3b represent Proposed Additional Services. Total <br /> e„ - . -6 .e...o .: _, ...•ed co.,ac Hrse $165 Hrs2 $130 Hrse $220 Hrs® $175 .HrsdS 895 I Hrse $220 Survey Survey II <br /> I <br /> Task Sat Project Pcuco Cr Renewal <br /> Coordination&preparation related to:Project stop/startt E <br /> ("stop"per City:3/29/19;Mtg w/RWQCB:7/30;)-phone E <br /> E <br /> calls,research,prep,mtg attendance,and letter,re: i '' <br /> RWQCB contention of pipe connection from Kottinger 40 } $6,600 16 $2,080 2 $440 4 $700 18 $1,710 16 I $3,520 96 $15,050 t $0 $0 $753 $15,803 <br /> Crk.to Arroyo del Valle;proposals for both additional 3 > ( <br /> surveys and the for the hydrology study,and revisions to <br /> creekdesi•n. V 1 1 <br /> 3a.2':Design of new project area(north of the creek entry 6 i <br /> *'culvert). $990 2 $260 2 $440 0 i I $0 14 $1,330 0 E $0 24 $3,020 $0 $0 $151 $3,171 <br /> ' Subtotal 46 < $7,590 18 1 $2,340 4' ' $880 4 5 $700, 32 $3,040. 16 $3,520 120 I $18,070 $0v $0. $0 $0 $904 $18,974 <br /> Tek amt Properctlrn of f jrdacloyy study/cnclysiar surveys <br /> Preparation of topo and underground utility surveys in theI <br /> f E <br /> parks and in the new park area(parcel north of creek 2 i $330 2 $260 2 $440 0 $0 2 $190 0 i $0 8 $1,220 $3,250 $4,500 E $388 $8,138 $449 $9,806 <br /> culvert). i i I o <br /> Coordination related to preparation of TR-55 hydrology 3 ( 3 <br /> 6 I $990 12 $1,560 2 E $440 4 I $700 8 $760 2 I $440 34 $4,890 $0 $0 $245 $5,135 <br /> study/analysis. i f i i <br /> Hydrology study/analysis of existing conditions inI <br /> j I <br /> Kottinger Creek required by RWQCB, including: E fI <br /> Characterization of existing subbasins;TR-55 estimates of I ? € 4 <br /> peak flows:Normal flow calculations(1D model)for cross 8 $1,320 24 $3,120 10 $2,200 48 i $8,400 64 $6,080 24 f $5,280 178 $26,400 E $0 $0 $1,320 $27,720 <br /> section and channel slope design; Memo describing ) I i <br /> depth,freeboard,velocities,peak flows,and channel i <br /> ; .. f <br /> stabilization recommendations. i <br /> i <br /> Incorporation of input from hydrology 3 lE i <br /> 3b.4 study/recommendations into Preliminary Schematic 6 f $990 12 $1,560 4 $880 8 I $1,400 12 $1,140 6 j $1,320 48 $7,290 i $0 $0 $365 $7,655 <br /> •. Illustrative Plan. <br /> Subtotal 22 $3,630 50 ,' $6,500 18.? $3,960 60 ,'. $10,500 86 $8,170 32 ,. $7,040 268 ' $39,800 $3,250"'$4,500; $388 $8;138. $2,378 $50,315 <br /> TotalI 68 $11,220 I 68 $8,840 22 $4,840 64 ($11,200 118 $11,210 I 48 $10,560 388 $57,870 $3,250 $4,$00 $388 I $8,138 $3,281 $69,289 <br /> P.1 of 1 MIG,Inc. <br />