Laserfiche WebLink
<br />S. Imnact Llc(2t Some proposed residential development on the Central Parcel <br />south of the Village Center would be exposed to a L.... of greater than 65 dB. <br /> <br />Mitigation Measures: <br />Measure Llc(2). Increase the height and extend the length of the proposed landscaped <br />berm. <br /> <br />Measure LIc(3). Require detailed project-specific noise studies for each development <br />project in an area where the standard is exceeded to characterize noise conditions and to <br />identify the noise reduction features that must be incorporated to achieve acceptable <br />interior noise levels, and require inCOrPOration of those features into construction. <br /> <br />Finding: Specific economic, social, or other considerations make infeasible mitigation <br />measures or project alternatives identified in the final EIR. <br /> <br />Facts in SUDoort of Finding: The following facts demonstrate that it is not feasible to <br />mitigate the impact to a less than significant level. <br /> <br />a. <br />reference. <br /> <br />The Facts in Support of Finding for Impact LIa(1) are incorporated by <br /> <br />6. ImDact LId. Proposed single-family residential development on the Central Parcel <br />between Bernal A venue and the south end of the Village Center would be exposed to a L.... <br />of greater than 60 dB. <br /> <br />MitilZation Measures: <br />Measure LId(l) and (2). Increase the height and extend the length of the noise mitigation <br />feature proposed for that portion of the Central Parcel south of the Village Green. <br /> <br />Measure LId(3). Require detailed project-specific noise studies for each development <br />project in an area where the standard is exceeded to characterize noise conditions and to <br />identify the noise reduction features that must be incorporated to achieve acceptable <br />interior noise levels, and require incorporation of those features into construction. <br /> <br />Finding: Specific economic, social, or other considerations make infeasible mitigation <br />measures or project alternatives identified in the Final EIR. <br /> <br />Facts in SUDoort of Finding: The following facts demonstrate that it is not feasible to <br />mitigate the impact to a less than significant level. <br /> <br />a. <br />reference. <br /> <br />The Facts in Support of Finding for Impact LIa(l) are incorporated by <br /> <br />SF:FMPo.AGR\WEX\61131664.2 <br />062499 <br /> <br />A-61 <br /> <br />WEX-660B3 <br />